{"id":439702,"date":"2024-10-20T08:10:39","date_gmt":"2024-10-20T08:10:39","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-376-2023\/"},"modified":"2024-10-26T15:18:41","modified_gmt":"2024-10-26T15:18:41","slug":"aci-376-2023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-376-2023\/","title":{"rendered":"ACI 376 2023"},"content":{"rendered":"

Keywords: bund wall; commissioning; cryogenic; damage stability; decommissioning; earthquake design levels; fatigue; float out; floating storage unit; foundation heating; gravity base structure; impact loads; liners; liquefied natural gas; liquid stratification; permanent ballast; purging; refrigerated liquefied gas; reinforcement (cryogenic); tanks; thermal corner protection.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
3<\/td>\nTITLE PAGE <\/td>\n<\/tr>\n
6<\/td>\nINTRODUCTION <\/td>\n<\/tr>\n
7<\/td>\nCHAPTER 1\u2014GENERAL REQUIREMENTS
1.1\u2014Scope <\/td>\n<\/tr>\n
8<\/td>\n1.2\u2014Quality assurance <\/td>\n<\/tr>\n
9<\/td>\n1.3\u2014Engineer <\/td>\n<\/tr>\n
10<\/td>\nCHAPTER 2\u2014NOTATION AND DEFINITIONS
2.1\u2014Notation <\/td>\n<\/tr>\n
11<\/td>\n2.2\u2014Definitions <\/td>\n<\/tr>\n
18<\/td>\nCHAPTER 3\u2014REFERENCED STANDARDS <\/td>\n<\/tr>\n
21<\/td>\nCHAPTER 4\u2014MATERIALS
4.1\u2014Testing of materials
4.2\u2014Cementitious materials
4.3\u2014Aggregates <\/td>\n<\/tr>\n
22<\/td>\n4.4\u2014Water
4.5\u2014Admixtures
4.6\u2014Fibers <\/td>\n<\/tr>\n
23<\/td>\n4.7\u2014Deformed reinforcing bars <\/td>\n<\/tr>\n
24<\/td>\n4.8\u2014Plate steel composite with concrete
4.9\u2014Prestressed reinforcement <\/td>\n<\/tr>\n
25<\/td>\n4.10\u2014Prestressing anchorages
4.11\u2014Post-tensioning ducts
4.12\u2014Grout <\/td>\n<\/tr>\n
26<\/td>\n4.13\u2014Metal liners and nonstructural metal components
4.14\u2014Insulation <\/td>\n<\/tr>\n
27<\/td>\n4.15\u2014Coating requirements <\/td>\n<\/tr>\n
28<\/td>\nCHAPTER 5\u2014DESIGN LOADS, LOADING CONDITIONS, AND LOAD COMBINATIONS
5.1\u2014General
5.2\u2014Design loads <\/td>\n<\/tr>\n
33<\/td>\n5.3\u2014Loading conditions <\/td>\n<\/tr>\n
34<\/td>\n5.4\u2014Load combinations <\/td>\n<\/tr>\n
36<\/td>\nCHAPTER 6\u2014MINIMUM PERFORMANCE REQUIREMENTS
6.1\u2014General <\/td>\n<\/tr>\n
37<\/td>\n6.2\u2014Primary concrete container <\/td>\n<\/tr>\n
39<\/td>\n6.3\u2014Secondary concrete container <\/td>\n<\/tr>\n
49<\/td>\n6.4\u2014Roof performance criteria
6.5\u2014Other performance criteria
6.6\u2014Concrete quality <\/td>\n<\/tr>\n
54<\/td>\n6.7\u2014Shotcrete
6.8\u2014Coating requirements <\/td>\n<\/tr>\n
55<\/td>\n6.9\u2014Metal components <\/td>\n<\/tr>\n
56<\/td>\nCHAPTER 7\u2014LOAD FACTORS
7.1\u2014General
7.2\u2014Load factors for ultimate limit state <\/td>\n<\/tr>\n
60<\/td>\n7.3\u2014Load factors for serviceability limit state <\/td>\n<\/tr>\n
61<\/td>\nCHAPTER 8\u2014ANALYSIS AND DESIGN
8.1\u2014Methods of analysis <\/td>\n<\/tr>\n
68<\/td>\n8.2\u2014Container design basis <\/td>\n<\/tr>\n
69<\/td>\n8.3\u2014Foundation design <\/td>\n<\/tr>\n
70<\/td>\n8.4\u2014Wall design <\/td>\n<\/tr>\n
73<\/td>\n8.5\u2014Roof design <\/td>\n<\/tr>\n
75<\/td>\n8.6\u2014Horizontal shear transfer in composite construction <\/td>\n<\/tr>\n
76<\/td>\nCHAPTER 9\u2014DETAILING
9.1\u2014General
9.2\u2014Reinforcement details <\/td>\n<\/tr>\n
78<\/td>\n9.3\u2014Internal prestressing systems <\/td>\n<\/tr>\n
79<\/td>\n9.4\u2014External prestressing systems
9.5\u2014Concrete containment wall <\/td>\n<\/tr>\n
81<\/td>\n9.6\u2014Metal components <\/td>\n<\/tr>\n
82<\/td>\n9.7\u2014Anchorage to concrete <\/td>\n<\/tr>\n
83<\/td>\n9.8\u2014Liners and coatings <\/td>\n<\/tr>\n
85<\/td>\nCHAPTER 10\u2014FOUNDATIONS
10.1\u2014General <\/td>\n<\/tr>\n
86<\/td>\n10.2\u2014Geotechnical investigation <\/td>\n<\/tr>\n
89<\/td>\n10.3\u2014Design requirements for shallow foundations <\/td>\n<\/tr>\n
92<\/td>\n10.4\u2014Design requirements for deep foundations <\/td>\n<\/tr>\n
96<\/td>\n10.5\u2014Ground improvement <\/td>\n<\/tr>\n
97<\/td>\n10.6\u2014Foundation details <\/td>\n<\/tr>\n
99<\/td>\n10.7\u2014Foundation performance monitoring details <\/td>\n<\/tr>\n
100<\/td>\n10.8\u2014Monitoring frequency <\/td>\n<\/tr>\n
102<\/td>\n10.9\u2014Inspection and testing <\/td>\n<\/tr>\n
104<\/td>\nCHAPTER 11\u2014CONSTRUCTION REQUIREMENTS
11.1\u2014Construction plan
11.2\u2014Tolerances <\/td>\n<\/tr>\n
107<\/td>\n11.3\u2014Shotcrete for external prestressing systems <\/td>\n<\/tr>\n
108<\/td>\n11.4\u2014Post-tensioning <\/td>\n<\/tr>\n
112<\/td>\n11.5\u2014Winding of prestressed reinforcement: wire or strand <\/td>\n<\/tr>\n
113<\/td>\n11.6\u2014Forming <\/td>\n<\/tr>\n
114<\/td>\n11.7\u2014Construction joints <\/td>\n<\/tr>\n
115<\/td>\n11.8\u2014Concrete embedments
11.9\u2014Coatings
11.10\u2014Welding <\/td>\n<\/tr>\n
116<\/td>\nCHAPTER 12\u2014TESTING, COMMISSIONING AND DECOMMISSIONING
12.1\u2014Scope
12.2\u2014Testing <\/td>\n<\/tr>\n
120<\/td>\n12.3\u2014Pressure and vacuum testing
12.4\u2014Purging into service <\/td>\n<\/tr>\n
122<\/td>\n12.5\u2014Cool-down <\/td>\n<\/tr>\n
124<\/td>\n12.6\u2014Settlement and movement monitoring <\/td>\n<\/tr>\n
125<\/td>\n12.7\u2014Tank fill methods
12.8\u2014Decommissioning: purging out of service and warm-up <\/td>\n<\/tr>\n
127<\/td>\n12.9\u2014Recordkeeping
12.10\u2014Nameplate <\/td>\n<\/tr>\n
129<\/td>\nAPPENDIX A\u2014TANK CONFIGURATIONS, DETAILS, AND EXAMPLES
RA.1\u2014Tank configurations
RA.2\u2014Full-containment tanks: typical details
RA.3\u2014Examples of base joint details <\/td>\n<\/tr>\n
140<\/td>\nAPPENDIX B\u2014OFFSHORE CONCRETE TERMINALS
B.1\u2014Scope
B.2\u2014General <\/td>\n<\/tr>\n
141<\/td>\nB.3\u2014Loads and load combinations <\/td>\n<\/tr>\n
144<\/td>\nB.4\u2014Concrete and reinforcement materials <\/td>\n<\/tr>\n
145<\/td>\nB.5\u2014Global and local structural analysis <\/td>\n<\/tr>\n
147<\/td>\nB.6\u2014Criteria and methodology of concrete sectional design
B.7\u2014Fatigue performance criteria <\/td>\n<\/tr>\n
148<\/td>\nB.8\u2014Design considerations during construction, transportation, and installation <\/td>\n<\/tr>\n
151<\/td>\nB.9\u2014Decommissioning
B.10\u2014Design for accidents <\/td>\n<\/tr>\n
154<\/td>\nAPPENDIX C\u2014FATIGUE PERFORMANCE
C.1\u2014Scope
C.2\u2014General
C.3\u2014Fatigue performance criteria <\/td>\n<\/tr>\n
158<\/td>\nAPPENDIX D\u2014REQUIREMENTS FOR OUTER CONCRETE CONTAINER FOR MEMBRANE TANKS
D.1\u2014General requirements <\/td>\n<\/tr>\n
159<\/td>\nD.2\u2014Notation and definitions
D.3\u2014Referenced standards
D.4\u2014Materials
D.5\u2014Design loads, loading conditions, and load combinations <\/td>\n<\/tr>\n
160<\/td>\nD.6\u2014Minimum performance requirements <\/td>\n<\/tr>\n
163<\/td>\nD.7\u2014Load factors <\/td>\n<\/tr>\n
165<\/td>\nD.8\u2014Analysis and design
D.9\u2014Detailing
D.10\u2014Foundations
D.11\u2014Construction requirements
D.12\u2014Testing commissioning and decommissioning <\/td>\n<\/tr>\n
166<\/td>\nCOMMENTARY REFERENCES <\/td>\n<\/tr>\n
169<\/td>\nAuthored documents <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ACI CODE-376-23: Refrigerated Liquefied Gas Containment for Concrete Structures\u2014Code Requirements and Commentary<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ACI<\/b><\/a><\/td>\n2023<\/td>\n177<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":439709,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2650],"product_tag":[],"class_list":{"0":"post-439702","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-aci","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/439702","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/439709"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=439702"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=439702"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=439702"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}