{"id":447377,"date":"2024-10-20T08:51:40","date_gmt":"2024-10-20T08:51:40","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-23-30483356-dc-2023\/"},"modified":"2024-10-26T16:30:47","modified_gmt":"2024-10-26T16:30:47","slug":"bsi-23-30483356-dc-2023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-23-30483356-dc-2023\/","title":{"rendered":"BSI 23\/30483356 DC 2023"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | 30483356-NC.pdf <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | 41_e_stf (6).pdf <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 4 Specimen requirements 5 Definition and preparation of specimen 5.1 Test configuration <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 5.2 Target bundle (bundle\u00a0T) 5.2.1 Definition and constitution 5.2.2 Preparation 5.2.3 Lay up the seven cables as follows <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 5.3 Protected bundle (bundle P) 5.3.1 Definition and constitution 5.3.2 Preparation 5.3.3 Lay up the seven cables as follows <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 6 Apparatus 6.1 Electrical equipment – Test configurations (case of a three-phase 115\u00a0VAC network) <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 6.2 Test equipment 6.3 Test protocol <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 6.4 Test rig set-up 6.5 Description of the expected measurements 7 Method 7.1 Test procedure <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 7.2 Short-circuit pass\/fail criteria <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 7.3 Examination 7.4 Test report <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 8 Requirements <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" BS EN 6059-502 Aerospace series – Electrical cables, installation Protection sleeves – Test methods – Part 502: Resistance to electrical arcs<\/b><\/p>\n |