{"id":449395,"date":"2024-10-20T09:02:28","date_gmt":"2024-10-20T09:02:28","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/nationalgrid-esb750-errata-revisions-2023\/"},"modified":"2024-10-26T16:54:40","modified_gmt":"2024-10-26T16:54:40","slug":"nationalgrid-esb750-errata-revisions-2023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/national-grid\/nationalgrid-esb750-errata-revisions-2023\/","title":{"rendered":"NationalGrid esb750 errata revisions 2023"},"content":{"rendered":"
None<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | TABLE of CONTENTS <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | General Notice ESB No. 750-2022 (January 2022) \u2013 Specifications for Electrical Installations (Upstate NY, MA) <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | ESB No. 751-2014 (June 2014) \u201cGeneral Requirements for Services Above 600 Volts\u201d ESB No. 752-1994, 2nd Printing April 2002 \u201cService above 15,000 volts\u201d <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | ESB No. 753-1993, 2nd Printing April 2002 \u201cPrimary Meter Pole\u201d <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 753ER-1 <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 753ER-1A <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 753ER-2 <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 753ER-3 <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 753ER-4 <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 753ER-5 <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 753ER-6 <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 753ER-7 <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 753ER-7A <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 753ER-8 <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 753ER-9 <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | ESB No. 754A-1992, 2nd Printing June 2002 \u201cSingle Phase Outdoor Pad Mounted Transformer\u201d ESB No. 754-2007 \u201cOutdoor Pad Mounted or Vault Enclosed Three Phase Transformer\u201d ESB No. 755-2003 \u201cOperation & Maintenance Requirements for Services Above 600 volts\u201d ESB No. 756-2021 \u201cGeneral Requirements for Parallel Generation Connected to a National Grid Owned EPS\u201d, version 7.0 ESB No. 756 Appendix A; \u201cRequirements for Parallel Generation Connected to National Grid Facilities in New York\u201d, version 6.0 <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | ESB No. 756 Appendix B; \u201cDistributed Generation Connected to National Grid Distribution Facilities Per The New York Standardized Interconnection Requirements\u201d, version 8.0 <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | ESB No. 756 Appendix C; \u201cDistributed Generation Connected to National Grid Distribution Facilities Per The Massachusetts Standards for Interconnecting Distributed Generation\u201d, version 9.0\u201d ESB No. 756 Appendix D; \u201cDistributed Generation Connected to National Grid Distribution Facilities Per The Rhode Island Standards for Interconnecting Distributed Generation\u201d <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | ESB No. 756 Appendix E; \u201cRequirements for Parallel Generation Connected to National Grid Facilities in New Hampshire\u201d ESB No. 757, April 2018 \u201cRequirements for Services Supplied from National Grid\u2019s Secondary Networks\u201d ESB No. 758, Jan. 1985 \u201cPrimary Service to Metal Enclosed Gear\u201d <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | ESB No. 759A <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | ESB No. 759B <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | REVISION HISTORY <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Electrical Service Bulletin (ESB) 750: Specifications for Electrical Installations – Errata and Revisions (May 2023)<\/b><\/p>\n |