{"id":454085,"date":"2024-10-20T09:33:37","date_gmt":"2024-10-20T09:33:37","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iec-61097-42024\/"},"modified":"2024-10-26T17:45:01","modified_gmt":"2024-10-26T17:45:01","slug":"bs-iec-61097-42024","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iec-61097-42024\/","title":{"rendered":"BS IEC 61097-4:2024"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 2 Normative references <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3 Terms and definitions 4 Performance requirements 4.1 Overview 4.2 Non-operational requirements 4.2.1 General 4.2.2 Warning of radiation hazard <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4.2.3 Power supply changeover 4.3 Operational requirements for ship earth stations 4.3.1 Capabilities 4.3.2 Ship station identity 4.3.3 Distress alerting <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4.3.4 Position updating 4.4 Operational requirements for EGC receivers 4.4.1 Capabilities <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.4.2 General 4.4.3 Position and area code updating 4.4.4 Indication of receipt of priority message <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4.4.5 Indication of tuning and synchronisation 4.4.6 Printing selection 4.4.7 Printing device 4.5 Performance related requirements from IEC 60945 <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.6 Other requirements 4.7 Long-range identification and tracking 4.7.1 General 4.7.2 Capabilities <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.7.3 Functionality 4.7.4 Communication system 5 Technical characteristics 5.1 Overview 5.2 Environmental and electromagnetic compatibility requirement Tables Table 1 \u2013 Data to be transmitted from the shipborne equipment <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.3 Radiated spurious emissions 5.4 Interfaces Table 2 \u2013 Environmental conditions <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.5 Interfering signals 6 Methods of testing and required test results 6.1 Overview 6.1.1 General <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.1.2 Performance requirements 6.1.3 Technical characteristics 6.2 Tests of non-operational requirements 6.3 Tests of operational requirements for ship earth stations 6.3.1 Capabilities 6.3.2 Ship station identity 6.3.3 Distress alerting <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.3.4 Position updating 6.4 Tests of operational requirements for EGC receivers 6.4.1 Capabilities 6.4.2 General 6.4.3 Position and area code updating <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.4.4 Indication of receipt of priority message 6.4.5 Indication of tuning and synchronisation 6.4.6 Printing selection 6.4.7 Printing device 6.5 Tests of performance related requirements from IEC 60945 6.6 Tests of other requirements <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.7 Long-range identification and tracking 6.7.1 General 6.7.2 Capabilities 6.7.3 Functionality 6.7.4 Communication system <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 6.8 Tests of technical characteristics 6.8.1 Inmarsat tests 6.8.2 Tests for environmental and electromagnetic compatibility <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6.8.3 Interfaces 6.8.4 Interfering signals <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Table B.1 \u2013 Limits of unwanted emissions up to 1 000 MHz <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Table B.2 \u2013 Limits of unwanted emissions above 1 000 MHz <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Table B.3 \u2013 Limits of unwanted emission within the operating band with carrier-on <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Table C.1 \u2013 Phase I Inmarsat-C schedule of tests <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Table C.2 \u2013 Phase I EGC receiver schedule of tests <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Table C.3 \u2013 Phase II schedule of tests <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Global maritime distress and safety system (GMDSS) – Part 4: Inmarsat-C ship earth station and Inmarsat enhanced group call (EGC) equipment \u2013 Operational and performance requirements, methods of testing and required test results<\/b><\/p>\n |