{"id":457312,"date":"2024-10-20T09:50:33","date_gmt":"2024-10-20T09:50:33","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c57-150-2023-4\/"},"modified":"2024-10-26T18:17:29","modified_gmt":"2024-10-26T18:17:29","slug":"ieee-c57-150-2023-4","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c57-150-2023-4\/","title":{"rendered":"IEEE C57.150-2023"},"content":{"rendered":"
Revision Standard – Active. Information for reducing the risk of damage and delays during the transportation of transformers and reactors rated 10 000 kVA or higher is provided in this guide.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std C57.150\u2122-2023 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 1.\u2002Overview 1.1\u2002Scope 1.2\u2002Purpose 1.3\u2002Word usage <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 2.\u2002Normative references 3.\u2002Definitions, acronyms, and abbreviations 3.1\u2002Definitions <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 3.2\u2002Acronyms and abbreviations 4.\u2002Request for quotation and specification <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.\u2002Design considerations for transport 5.1\u2002New transformers and reactors 5.2\u2002Existing transformers and reactors <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.3\u2002Internal Bracing <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.4\u2002Main transformer or reactor tank <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.5\u2002Transportation preparation\u2014accessories <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 6.\u2002Planning for heavy-haul transporation 6.1\u2002General <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 6.2\u2002Heavy-haul situations 6.3\u2002Identifying suitable heavy-hauler companies <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 6.4\u2002Determinations of actual equipment transportation dimensions <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 6.5\u2002Route inspections and verification of transportation route <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 6.6\u2002Selection of proper heavy-haul equipment <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 6.7\u2002Applicable safety and environmental requirements, regulations, and laws 6.8\u2002Permits 6.9\u2002Insurance coverage 7.\u2002Transport 7.1\u2002Transportation information <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 7.2\u2002Equipment orientation 7.3\u2002Transport terminology <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 7.4\u2002Barge and ocean vessels <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 7.5\u2002Rail <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 7.6\u2002Air cargo 8.\u2002Heavy-haul transportation 8.1\u2002General 8.2\u2002Condition of heavy-haul equipment 8.3\u2002Inspection of equipment prior to receiving <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 8.4\u2002Offloading the equipment onto heavy-haul transportation equipment 8.5\u2002Securing the load <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 8.6\u2002Transportation to the destination 9.\u2002Arrival (receipt) inspection 9.1\u2002General 9.2\u2002Preparation for inspection <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 9.3\u2002Visual checks <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 9.4\u2002Offloading considerations <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 9.5\u2002Up-righting of large shell-form transformers or reactors 9.6\u2002Inspection and offloading of separately shipped parts and components accessories <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 9.7\u2002Internal inspection <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 9.8\u2002Electrical tests <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 9.9\u2002Mechanical tests <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 10.\u2002Transportation and Delivery Flow Chart\u2014Swim Lane Concept <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | Annex\u00a0A (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for the Transportation of Transformers and Reactors Rated 10 000 kVA or Higher (Published)<\/b><\/p>\n |