{"id":64651,"date":"2024-10-17T12:33:19","date_gmt":"2024-10-17T12:33:19","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/astm-d5163-4\/"},"modified":"2024-10-24T18:16:32","modified_gmt":"2024-10-24T18:16:32","slug":"astm-d5163-4","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/astm\/astm-d5163-4\/","title":{"rendered":"ASTM-D5163"},"content":{"rendered":"<\/p>\n

1.1 This guide covers procedures for establishing a program to monitor the performance of Coating Service Level I coating systems in operating nuclear power plants. Monitoring is an on going process of evaluating the condition of the in-service coating systems.<\/p>\n

1.2 It is the intent of this guide to provide a recommended basis for establishing a coatings monitoring program, not to mandate a singular basis for all programs. Variations or simplifications of the program described in this guide may be appropriate for each operating nuclear power plant depending on their licensing commitments. Similar guidelines are applicable for Coating Service Level III and other areas outside containment.<\/p>\n

1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nScope
Referenced Documents
Significance and Use <\/td>\n<\/tr>\n
2<\/td>\nResponsibility
Frequency
Records and Past History
Monitoring Procedure
Personnel Requirements, Qualifications, and Training
Inspection Plan <\/td>\n<\/tr>\n
3<\/td>\nReporting and Documentation
FIG. 1
FIG. 2 <\/td>\n<\/tr>\n
4<\/td>\nEvaluation
Keywords <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

D5163-05 Standard Guide for Establishing Procedures to Monitor the Performance of Service Level I Coatings in an Operating Nuclear Power Plant<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASTM<\/b><\/a><\/td>\n2005<\/td>\n4<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":64652,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[463,2637],"product_tag":[],"class_list":{"0":"post-64651","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-27-120-20","7":"product_cat-astm","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/64651","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/64652"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=64651"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=64651"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=64651"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}