{"id":77993,"date":"2024-10-17T18:09:55","date_gmt":"2024-10-17T18:09:55","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/usgbc-leedforeboperationsandmaintenancereferenceguide-2008\/"},"modified":"2024-10-24T19:35:24","modified_gmt":"2024-10-24T19:35:24","slug":"usgbc-leedforeboperationsandmaintenancereferenceguide-2008","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/usgbc\/usgbc-leedforeboperationsandmaintenancereferenceguide-2008\/","title":{"rendered":"USGBC LEEDforEBOperationsandMaintenanceReferenceGuide 2008"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
11<\/td>\n | Preface <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Introduction I. Why Make Your Building Green? II. LEED\u00ae Green Building Rating System <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | III. Overview and Process <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | IV. Minimum Program Requirements <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | V. Certification Strategy <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | VI. Initial Certification vs. Recertification <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | VII. Performance Period <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | VIII. Submittals <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | IX. Multitenant Exemptions <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | X. Facility Alterations and Additions <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | XI. Exemplary Performance Strategies XII. Policy Model <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | XIII. Tools for Registered Projects <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | XIV. Reference Guide <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | XV. Definitions <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Sustainable Sites (SS) <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Credit 1 LEED-Certified Design and Construction <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Credit 2 Building Exterior and Hardscape Management Plan <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Credit 3 Integrated Pest Management, Erosion Control, and Landscape Management Plan <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | Credit 4.1 – 4.4 Alternative Commuting Transportation <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | Credit 5 Reduced Site Disturbance: Protect or Restore Open Space <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | Credit 6 Stormwater Management <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | Credit 7 Heat Island Reduction: Nonroof <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | Credit 7.2 Heat Island Reduction: Roof <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | Credit 8 Light Pollution Reduction <\/td>\n<\/tr>\n | ||||||
117<\/td>\n | Water Efficiency (WE) <\/td>\n<\/tr>\n | ||||||
121<\/td>\n | Prerequisite 1 Minimum Indoor Plumbing Fixture and Fitting Efficiency <\/td>\n<\/tr>\n | ||||||
133<\/td>\n | Credit 1.1 – 1.2 Water Performance Measurement <\/td>\n<\/tr>\n | ||||||
141<\/td>\n | Credit 2.1 – 2.3 Additional Indoor Plumbing Fixture and Fitting Efficiency <\/td>\n<\/tr>\n | ||||||
143<\/td>\n | Credit 3.1 – 3.3 Water-Efficient Landscaping <\/td>\n<\/tr>\n | ||||||
159<\/td>\n | Credit 4.1 – 4.2 Cooling Tower Water Management <\/td>\n<\/tr>\n | ||||||
167<\/td>\n | Energy & Atmosphere (EA) <\/td>\n<\/tr>\n | ||||||
171<\/td>\n | Prerequisite 1 Energy Efficiency Best Management Practices: Planning, Documentation, and Opportunity Assessment <\/td>\n<\/tr>\n | ||||||
183<\/td>\n | Prerequisite 2 Minimum Energy Efficiency Performance <\/td>\n<\/tr>\n | ||||||
185<\/td>\n | Prerequisite 3 Refrigerant Management\u2014Ozone Protection <\/td>\n<\/tr>\n | ||||||
193<\/td>\n | Credit 1 Optimize Energy Efficiency Performance <\/td>\n<\/tr>\n | ||||||
209<\/td>\n | Credit 2.1 Existing Building Commissioning: Investigation and Analysis <\/td>\n<\/tr>\n | ||||||
219<\/td>\n | Credit 2.2 Existing Building Commissioning: Implementation <\/td>\n<\/tr>\n | ||||||
225<\/td>\n | Credit 2.3 Existing Building Commissioning: Ongoing Commissioning <\/td>\n<\/tr>\n | ||||||
231<\/td>\n | Credit 3.1 Performance Measurement: Building Automation System <\/td>\n<\/tr>\n | ||||||
235<\/td>\n | Credit 3.2 – 3.3 Performance Measurement: System-Level Metering <\/td>\n<\/tr>\n | ||||||
241<\/td>\n | Credit 4.1 – 4.4 On-Site and Off-Site Renewable Energy <\/td>\n<\/tr>\n | ||||||
253<\/td>\n | Credit 5 Refrigerant Management <\/td>\n<\/tr>\n | ||||||
263<\/td>\n | Credit 6 Emissions Reduction Reporting <\/td>\n<\/tr>\n | ||||||
273<\/td>\n | Materials & Resources (MR) <\/td>\n<\/tr>\n | ||||||
277<\/td>\n | Prerequisite 1 Sustainable Purchasing Policy <\/td>\n<\/tr>\n | ||||||
281<\/td>\n | Prerequisite 2 Solid Waste Management Policy <\/td>\n<\/tr>\n | ||||||
285<\/td>\n | Credit 1.1 – 1.3 Sustainable Purchasing: Ongoing Consumables <\/td>\n<\/tr>\n | ||||||
293<\/td>\n | Credit 2.1 – 2.2 Sustainable Purchasing: Durable Goods <\/td>\n<\/tr>\n | ||||||
301<\/td>\n | Credit 3 Sustainable Purchasing: Facility Alterations and Additions <\/td>\n<\/tr>\n | ||||||
315<\/td>\n | Credit 4 Sustainable Purchasing: Reduced Mercury in Lamps <\/td>\n<\/tr>\n | ||||||
323<\/td>\n | Credit 5 Sustainable Purchasing: Food <\/td>\n<\/tr>\n | ||||||
331<\/td>\n | Credit 6 Solid Waste Management: Waste Stream Audit <\/td>\n<\/tr>\n | ||||||
337<\/td>\n | Credit 7.1 – 7.2 Solid Waste Management: Ongoing Consumables <\/td>\n<\/tr>\n | ||||||
343<\/td>\n | Credit 8 Solid Waste Management: Durable Goods <\/td>\n<\/tr>\n | ||||||
349<\/td>\n | Credit 9 Solid Waste Management: Facility Alterations and Additions <\/td>\n<\/tr>\n | ||||||
357<\/td>\n | Indoor Environmental Quality (EQ) <\/td>\n<\/tr>\n | ||||||
359<\/td>\n | Credit 1.2 IAQ Best Management Practices: Outdoor Air Delivery Monitoring <\/td>\n<\/tr>\n | ||||||
361<\/td>\n | Prerequisite 1 Outdoor Air Introduction and Exhaust Systems <\/td>\n<\/tr>\n | ||||||
371<\/td>\n | Prerequisite 2 Environmental Tobacco Smoke (ETS) Control <\/td>\n<\/tr>\n | ||||||
377<\/td>\n | Prerequisite 3 Green Cleaning Policy <\/td>\n<\/tr>\n | ||||||
383<\/td>\n | Credit 1.1 IAQ Best Management Practices: IAQ Management Program <\/td>\n<\/tr>\n | ||||||
399<\/td>\n | Credit 1.3 IAQ Best Management Practices: Increased Ventilation <\/td>\n<\/tr>\n | ||||||
407<\/td>\n | Credit 1.4 IAQ Best Management Practices: Reduce Particulates in Air Distribution <\/td>\n<\/tr>\n | ||||||
411<\/td>\n | Credit 1.5 IAQ Best Management Practices: IAQ Management for Facility Alterations and Additions <\/td>\n<\/tr>\n | ||||||
419<\/td>\n | Credit 2.1 Occupant Comfort: Occupant Survey <\/td>\n<\/tr>\n | ||||||
423<\/td>\n | Credit 2.2 Occupant Comfort: Occupant-Controlled Lighting <\/td>\n<\/tr>\n | ||||||
429<\/td>\n | Credit 2.3 Occupant Comfort: Thermal Comfort Monitoring <\/td>\n<\/tr>\n | ||||||
435<\/td>\n | Credit 2.4 – 2.5 Occupant Comfort: Daylight and Views <\/td>\n<\/tr>\n | ||||||
449<\/td>\n | Credit 3.1 Green Cleaning: High-Performance Cleaning Program <\/td>\n<\/tr>\n | ||||||
457<\/td>\n | Credit 3.2 – 3.3 Green Cleaning: Custodial Effectiveness Assessment <\/td>\n<\/tr>\n | ||||||
463<\/td>\n | Credit 3.4 – 3.6 Green Cleaning: Purchase of Sustainable Cleaning Products and Materials <\/td>\n<\/tr>\n | ||||||
473<\/td>\n | Credit 3.7 Green Cleaning: Sustainable Cleaning Equipment <\/td>\n<\/tr>\n | ||||||
479<\/td>\n | Credit 3.8 Green Cleaning: Entryway Systems <\/td>\n<\/tr>\n | ||||||
483<\/td>\n | Credit 3.9 Green Cleaning: Indoor Integrated Pest Management <\/td>\n<\/tr>\n | ||||||
491<\/td>\n | Innovation in Operations (IO) <\/td>\n<\/tr>\n | ||||||
493<\/td>\n | Credit 1.1 – 1.4 Innovation in Operations <\/td>\n<\/tr>\n | ||||||
499<\/td>\n | Credit 2 LEED\u00ae Accredited Professional <\/td>\n<\/tr>\n | ||||||
503<\/td>\n | Credit 3 Documenting Sustainable Building Cost Impacts <\/td>\n<\/tr>\n | ||||||
511<\/td>\n | Glossary of Terms <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" LEED for Existing Buildings: Operations & Maintenance Reference Guide, First Edition<\/b><\/p>\n |