{"id":78814,"date":"2024-10-17T18:26:02","date_gmt":"2024-10-17T18:26:02","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asce-9780784408155-2006\/"},"modified":"2024-10-24T19:38:12","modified_gmt":"2024-10-24T19:38:12","slug":"asce-9780784408155-2006","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asce\/asce-9780784408155-2006\/","title":{"rendered":"ASCE 9780784408155 2006"},"content":{"rendered":"

CDRM Monograph 1 discusses quantification of exposure and vulnerability of complex, spatially distributed systems, yielding estimates of local and systemwide potential losses for different alternatives in multihazard decision situations.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
6<\/td>\nContents <\/td>\n<\/tr>\n
8<\/td>\nIntroduction and Executive Summary <\/td>\n<\/tr>\n
20<\/td>\nHazard Issues <\/td>\n<\/tr>\n
22<\/td>\nPSHA Uncertainty Analysis: Applications to the CEUS and the Pacific NW <\/td>\n<\/tr>\n
72<\/td>\nSystems Evaluation Issues <\/td>\n<\/tr>\n
74<\/td>\nThe Regional Economic Cost of a Tsunami Wave Generated by a Submarine Landslide off Palos Verdes, California <\/td>\n<\/tr>\n
102<\/td>\nThe Emerging Role of Remote Sensing Technology in Emergency Management <\/td>\n<\/tr>\n
125<\/td>\nContext and Resiliency: Influences on Electric Utility Lifeline Performance <\/td>\n<\/tr>\n
150<\/td>\nRisk Criteria Issues <\/td>\n<\/tr>\n
152<\/td>\nCriteria for Acceptable Risk in the Netherlands <\/td>\n<\/tr>\n
166<\/td>\nSystems Management Issues <\/td>\n<\/tr>\n
168<\/td>\nLandslide Risk Assessment and Remediation <\/td>\n<\/tr>\n
201<\/td>\nA Preliminary Study of Geologic Hazards for the Columbia River Transportation Corridor <\/td>\n<\/tr>\n
231<\/td>\nMultihazard Mitigation Los Angeles Water System: A Historical Perspective <\/td>\n<\/tr>\n
288<\/td>\nAppendices <\/td>\n<\/tr>\n
290<\/td>\nAppendix A: Short Biographies of Contributing Authors <\/td>\n<\/tr>\n
297<\/td>\nAppendix B: Rosters of the Two Participating Committees and Reviewers of Submitted Papers <\/td>\n<\/tr>\n
300<\/td>\nIndex
A
B
C
D
E <\/td>\n<\/tr>\n
301<\/td>\nF
G
H
I
J
K
L
M <\/td>\n<\/tr>\n
302<\/td>\nN
O
P
Q
R
S <\/td>\n<\/tr>\n
303<\/td>\nT
U
V
W <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Infrastructure Risk Management Processes<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASCE<\/b><\/a><\/td>\n2006<\/td>\n303<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":78815,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2660],"product_tag":[],"class_list":{"0":"post-78814","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asce","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/78814","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/78815"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=78814"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=78814"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=78814"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}