{"id":79592,"date":"2024-10-17T18:35:59","date_gmt":"2024-10-17T18:35:59","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1023-2005\/"},"modified":"2024-10-24T19:40:38","modified_gmt":"2024-10-24T19:40:38","slug":"ieee-1023-2005","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1023-2005\/","title":{"rendered":"IEEE 1023 2005"},"content":{"rendered":"

Revision Standard – Active. Revision of IEEE Std 1023-1988 This document provides recommended practices for applying human factors engineering (HFE) to systems and equipment that have significant human interfaces in nuclear power generating stations and other nuclear facilities.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nIEEE Std 1023-2004 Cover page <\/td>\n<\/tr>\n
3<\/td>\nTitle Page <\/td>\n<\/tr>\n
5<\/td>\nIntroduction
Notice to users
Patents <\/td>\n<\/tr>\n
6<\/td>\nErrata
Interpretations
Participants <\/td>\n<\/tr>\n
8<\/td>\nCONTENTS <\/td>\n<\/tr>\n
9<\/td>\n1. Overview
1.1 Scope
1.2 Purpose
2. Normative references <\/td>\n<\/tr>\n
10<\/td>\n3. Definitions <\/td>\n<\/tr>\n
11<\/td>\n4. Systematic application of human factors engineering
5. Basic considerations of human factors engineering <\/td>\n<\/tr>\n
12<\/td>\n5.1 Task considerations <\/td>\n<\/tr>\n
14<\/td>\n5.2 Environmental considerations <\/td>\n<\/tr>\n
15<\/td>\n5.3 Equipment considerations <\/td>\n<\/tr>\n
16<\/td>\n5.4 Personnel considerations <\/td>\n<\/tr>\n
17<\/td>\n5.5 Organization and support considerations <\/td>\n<\/tr>\n
19<\/td>\n6. Implementation of human factors engineering activities
6.1 Engineering process model <\/td>\n<\/tr>\n
20<\/td>\n6.2 Planning <\/td>\n<\/tr>\n
21<\/td>\n6.3 Analysis <\/td>\n<\/tr>\n
22<\/td>\n6.4 Specification <\/td>\n<\/tr>\n
24<\/td>\n6.5 Testing and evaluation <\/td>\n<\/tr>\n
25<\/td>\n6.6 Operations and maintenance <\/td>\n<\/tr>\n
27<\/td>\nAnnex A (informative) Bibliography <\/td>\n<\/tr>\n
29<\/td>\nAnnex B (informative) Sample implementations of HFE activities per the Star Model <\/td>\n<\/tr>\n
33<\/td>\nAnnex C (informative) Screening checklist <\/td>\n<\/tr>\n
36<\/td>\nAnnex D (informative) Design review checklist <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Recommended Practice for the Application of Human Factors Engineering to Systems, Equipment, and Facilities of Nuclear Power Generating Stations and Other Nuclear Facilities<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2005<\/td>\n40<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":79593,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-79592","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/79592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/79593"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=79592"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=79592"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=79592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}