{"id":81001,"date":"2024-10-17T18:50:15","date_gmt":"2024-10-17T18:50:15","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-95-2002\/"},"modified":"2024-10-24T19:45:23","modified_gmt":"2024-10-24T19:45:23","slug":"ieee-95-2002","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-95-2002\/","title":{"rendered":"IEEE 95 2002"},"content":{"rendered":"
Revision Standard – Active. This recommended practice provides information on the use of high direct voltage forproof tests and for periodic diagnostic tests on the groundwall insulation of stator (armature) wind-ings in ac electric machines.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | Title Page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Introduction Participants <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 1. Overview 1.1 Scope 1.2 Purpose 1.3 Application and limitations <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 2. References <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 3. Definitions <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4. Test preparations 4.1 Safety precautions required for high direct-voltage tests 4.2 Influencing factors <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.3 Gas-cooled machines 4.4 Liquid-cooled machines 4.5 Isolation of the winding from cables and auxiliary equipment <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.6 Sectionalizing the winding 5. Test equipment and connections 5.1 High direct-voltage test equipment <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.2 Discharge and grounding provisions <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.3 High-voltage test connection to the winding <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.4 Test connection to ground 6. Test procedure: proof tests <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.1 Test voltage for acceptance proof testing 6.2 Test voltage for maintenance proof testing 6.3 Voltage application 6.4 Discharging and grounding <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.5 Test results 6.6 Insulation failure 7. Test procedure: controlled overvoltage test 7.1 Test method 7.2 Test setup <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 7.3 Measured current 7.4 Test voltage for controlled overvoltage testing 7.5 Initial voltage level <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 7.6 Voltage increments <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 7.7 Discharging and grounding 7.8 Test results <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 7.9 Use of controlled overvoltage tests 8. Fault location <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 9. Suggested test record <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | Annex A \n(informative) \nTest procedures <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | Annex B \n(informative) \nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Recommended Practice for Insulation Testing of AC Electric Machinery (2300 V and Above) With High Direct Voltage<\/b><\/p>\n |