{"id":82118,"date":"2024-10-18T03:01:34","date_gmt":"2024-10-18T03:01:34","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1792-2012\/"},"modified":"2024-10-24T19:49:09","modified_gmt":"2024-10-24T19:49:09","slug":"ieee-1792-2012","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1792-2012\/","title":{"rendered":"IEEE 1792 2012"},"content":{"rendered":"
New IEEE Standard – Active. This recommended practice addresses activities related to preferred power supply (PPS) reliability, including design considerations, analytical studies, operational and maintenance considerations, and interface agreements between a nuclear power generating station (NPGS) and its associated Transmission Entities.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 1792\u2122-2011 Front cover <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Title page \n <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Introduction Notice to users Laws and regulations Copyrights <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Updating of IEEE documents Errata Interpretations Patents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Important notice \n 1. Overview <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 1.1 Scope 1.2 Purpose 2. Normative references 3. Definitions <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4. Design considerations 4.1 PPS interface 4.2 Improving PPS reliability <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.3 PPS analysis 5. Analytical studies 5.1 NPGS operating scenarios and alignments <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.2 Transmission system studies (TSSs) <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 5.3 NPGS calculations <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6. Operational considerations <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 6.1 Operational attributes <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 6.2 Operational practices 6.3 Restoration 6.4 Oversight <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 7. Maintenance considerations 7.1 Maintenance program 7.2 Maintenance practices <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 7.3 Responsibilities <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 7.4 Coordination and scheduling 7.5 Oversight 8. Interface agreement (IA) <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Annex A (informative) Interface agreement (IA) template <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Annex B (informative) Historical perspective of the PPS <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Annex C (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Recommended Practice for Nuclear Power Generating Station (NPGS) Preferred Power Supply (PPS) Reliability<\/b><\/p>\n |