{"id":98473,"date":"2024-10-18T11:14:14","date_gmt":"2024-10-18T11:14:14","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-b30-25-2013\/"},"modified":"2024-10-24T21:12:05","modified_gmt":"2024-10-24T21:12:05","slug":"asme-b30-25-2013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-b30-25-2013\/","title":{"rendered":"ASME B30.25 2013"},"content":{"rendered":"

B30.25 includes provisions that apply to the construction, installation, operation, inspection and maintenance of scrap and material handlers consisting of a base, a revolving upper structure with operator’s station(s), and a front for lifting scrap or materials using attachments such as magnets and grapples, and any variations thereof in which the equipment retains the same fundamental characteristics.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
5<\/td>\nCONTENTS <\/td>\n<\/tr>\n
6<\/td>\nFOREWORD <\/td>\n<\/tr>\n
8<\/td>\nASME B30 COMMITTEE ROSTER <\/td>\n<\/tr>\n
10<\/td>\nB30 STANDARD INTRODUCTION
SECTION I: SCOPE
SECTION II: SCOPE EXCLUSIONS
SECTION III: PURPOSE
SECTION IV: USE BY REGULATORY AGENCIES
SECTION V: EFFECTIVE DATE <\/td>\n<\/tr>\n
11<\/td>\nSECTION VI: REQUIREMENTS AND RECOMMENDATIONS
SECTION VII: USE OF MEASUREMENT UNITS
SECTION VIII: REQUESTS FOR REVISION
SECTION IX: REQUESTS FOR INTERPRETATION
SECTION X: ADDITIONAL GUIDANCE <\/td>\n<\/tr>\n
13<\/td>\nSUMMARY OF CHANGES <\/td>\n<\/tr>\n
15<\/td>\nChapter 25-0 Scope, Definitions, Personnel Competence, and References
SECTION 25-0.1: SCOPE OF B30.25
SECTION 25-0.2: DEFINITIONS
25-0.2.1 Types of Scrap and Material Handlers
25-0.2.2 General <\/td>\n<\/tr>\n
16<\/td>\nFigures
\n
Fig. 25-0.2.1-1 Crawler-Mounted Handler <\/td>\n<\/tr>\n
17<\/td>\nFig. 25-0.2.1-2 Pedestal-Mounted Handler <\/td>\n<\/tr>\n
18<\/td>\nFig. 25-0.2.1-3 Rail-Mounted Handler <\/td>\n<\/tr>\n
19<\/td>\nFig. 25-0.2.1-4 Wheel-Mounted Handler (Multiple Control Stations) <\/td>\n<\/tr>\n
20<\/td>\nFig. 25-0.2.1-5 Wheel-Mounted Handler (Single Control Station) <\/td>\n<\/tr>\n
21<\/td>\nSECTION 25-0.3: PERSONNEL COMPETENCE <\/td>\n<\/tr>\n
22<\/td>\nFig. 25-0.2.2-1 Two-Piece Front <\/td>\n<\/tr>\n
23<\/td>\nFig. 25-0.2.2-2 Three-Piece Front <\/td>\n<\/tr>\n
24<\/td>\nSECTION 25-0.4: REFERENCES <\/td>\n<\/tr>\n
25<\/td>\nChapter 25-1 Construction and Characteristics
SECTION 25-1.1: LIFT CAPACITY
25-1.1.1 Lift Capacity — Calculation and Verification
25-1.1.2 Lift Capacity Chart
25-1.1.3 Rated Lift Capacity
SECTION 25-1.2: BACKWARD STABILITY
25-1.2.1 Backward Stability
25-1.2.2 Backward Stability Conditions With Front Installed <\/td>\n<\/tr>\n
26<\/td>\n25-1.2.3 Backward Stability Conditions With Front Removed
SECTION 25-1.3: SWING MECHANISM
25-1.3.1 Swing Control
25-1.3.2 Swing Braking Means and Locking Device
SECTION 25-1.4: HANDLER TRAVEL
25-1.4.1 Travel Mechanism
25-1.4.2 Travel Brakes
SECTION 25-1.5: CONTROLS
25-1.5.1 General <\/td>\n<\/tr>\n
27<\/td>\n25-1.5.2 Travel Controls
25-1.5.3 Front Controls
25-1.5.4 Auxiliary Controls
SECTION 25-1.6: CABS
25-1.6.1 Construction <\/td>\n<\/tr>\n
28<\/td>\nFig. 25-1.5.2(b)-1 Wheel-Mounted Handler \u2014 Primary Travel Control Diagram
Fig. 25-1.5.2(b)-2 Track-Mounted Handler \u2014 Primary Travel Control Diagram <\/td>\n<\/tr>\n
29<\/td>\nFig. 25-1.5.3(c)-1 Primary Front Controls \u2014 Three-Piece Fronts
Fig. 25-1.5.3(c)-2 Primary Front Controls \u2014 Two-Piece Fronts <\/td>\n<\/tr>\n
30<\/td>\n25-1.6.2 Construction of Elevating Cabs
25-1.6.3 Platforms
25-1.6.4 Access to Cab
SECTION 25-1.7: GENERAL REQUIREMENTS
25-1.7.1 Identification
25-1.7.2 Exhaust Gases <\/td>\n<\/tr>\n
31<\/td>\n25-1.7.3 Fronts
25-1.7.4 Outriggers\/Stabilizers
25-1.7.5 Rail-Mounted Handlers
25-1.7.6 Welded Construction
25-1.7.7 Guards for Moving Parts
25-1.7.8 Hydraulic and Pneumatic Line Protection
25-1.7.9 Lubricating Points
25-1.7.10 Handler Modifications
25-1.7.11 Miscellaneous
SECTION 25-1.8: ELECTRICAL EQUIPMENT
25-1.8.1 Lifting Magnets <\/td>\n<\/tr>\n
32<\/td>\nSECTION 25-1.9: INSTRUCTION MANUALS <\/td>\n<\/tr>\n
33<\/td>\nChapter 25-2 Inspection, Testing, and Maintenance
SECTION 25-2.1: INSPECTION — GENERAL
25-2.1.1 Inspection Classification
25-2.1.2 Frequent Inspection
25-2.1.3 Periodic Inspection <\/td>\n<\/tr>\n
34<\/td>\n25-2.1.4 Handlers Not in Regular Use
25-2.1.5 Inspection Records
SECTION 25-2.2: TESTING
25-2.2.1 Operational Tests
SECTION 25-2.3: MAINTENANCE
25-2.3.1 Preventive Maintenance
25-2.3.2 Maintenance Procedure <\/td>\n<\/tr>\n
35<\/td>\n25-2.3.3 Adjustments and Repairs
25-2.3.4 Lubrication <\/td>\n<\/tr>\n
36<\/td>\nChapter 25-3 Operation
SECTION 25-3.1: QUALIFICATIONS AND RESPONSIBILITIES
25-3.1.1 Qualified Operators
25-3.1.2 Requirements for Qualified Operators
25-3.1.3 Responsibilities
25-3.1.3.1 Responsibilities of the Owner and User
25-3.1.3.1.1 <\/td>\n<\/tr>\n
37<\/td>\n25-3.1.3.1.2
25-3.1.3.2 Responsibilities of the Operator.
25-3.1.3.2.1
SECTION 25-3.2: HANDLING THE LOAD
25-3.2.1 Size of Load <\/td>\n<\/tr>\n
38<\/td>\n25-3.2.2 Holding the Load
25-3.2.3 Moving the Load
25-3.2.4 Personnel
SECTION 25-3.3: SIGNALS
25-3.3.1 Standard Signals
25-3.3.2 Hand Signals
25-3.3.3 Special Signals
25-3.3.4 Instructions
SECTION 25-3.4: MISCELLANEOUS
25-3.4.1 Cab Protection
25-3.4.2 Rail Clamps
25-3.4.3 Ballast or Counterweight
25-3.4.4 Rerailing Rail-Mounted Handlers <\/td>\n<\/tr>\n
39<\/td>\nFig. 25-3.3.2-1 Material Handler Hand Signals <\/td>\n<\/tr>\n
42<\/td>\n25-3.4.5 Swinging Rail-Mounted Locomotive Handlers
25-3.4.6 Footing
25-3.4.7 Storage
25-3.4.8 Refueling
25-3.4.9 Fire Extinguishers
25-3.4.10 Working Near Power Lines
Table
Table 25-3.4.10-1 Required Clearance for Normal Voltage in Operation Near High Voltage Power Lines <\/td>\n<\/tr>\n
43<\/td>\nASME B30.25 INTERPRETATIONS <\/td>\n<\/tr>\n
44<\/td>\nInterpretation: 25-02 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ASME B30.25 Scrap and Material Handlers<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASME<\/b><\/a><\/td>\n2013<\/td>\n48<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":98474,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2643],"product_tag":[],"class_list":{"0":"post-98473","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asme","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/98473","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/98474"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=98473"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=98473"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=98473"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}