ASCE 9780784411872 2011
$107.25
Pipelines 2011
Published By | Publication Date | Number of Pages |
ASCE | 2011 | 1491 |
This collection contains 135 peer-reviewed technical papers that discuss new solutions to some of the most critical infrastructure issues involving pipelines presented at the Pipelines 2011 Conference, held in Seattle, Washington, July 23-27, 2011.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Cover |
6 | Table of Contents |
16 | Asset Management Asset Management Answer to an EPA Order |
27 | Damage Identification Based on Modal Analysis of Prestressed Concrete Pipes |
39 | Development and the Comparison of a Weighted Factor and Fuzzy Inference Model for Performance Prediction of Metallic Water Pipelines |
48 | Portland’s Water Distribution Pipes Asset Management Plan |
59 | Optimized Pipe Renewal Programs Ensure Cost-Effective Asset Management |
70 | Crack Propagation in Prestressed Concrete Noncylinder Pipe Using Finite Element Method |
80 | Examination of Asbestos Cement Pipe Deterioration with Scanning Electron Microscopy |
94 | Post Rehabilitation Assessment of System Integrity and Effectiveness of Retro Fitted Cathodic Protection Using Long Term Acoustic Monitoring Data |
104 | National Database for Water Infrastructure System |
115 | Transitioning from Leak Detection to Leak Prevention: Proactive Repair of Steel Pipelines Using Fiber Reinforced Polymer (FRP) Composites |
123 | How to Fund Pipeline Renewal: Transitioning from O&M Funds to Capital Improvement Budgets |
133 | Managing Gravity Pipelines in Philadelphia |
141 | Using Real Age As a Better Indicator of Predicting Asset Remaining Life |
149 | Introduction of Mobile Asset Management Technology to a Mid-Size Utility |
162 | Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe Used at Energy Generation Facilities |
175 | Statistical Analysis of Condition Assessment Data and Prediction of Future Performance of PCCP |
185 | Asset Management Likelihood of Failure Scoring Improved by Condition Assessment Scoring Integration Techniques |
197 | Prestressed Concrete Cylinder Pipe Condition Assessment—What Works, What Doesn’t, What’s Next |
210 | It’s Never Easy…Development and Implementation of a Comprehensive Force Main Condition Assessment |
217 | Practical Application of Force Main Condition Assessment Methodologies for Long Term Asset Management Needs |
230 | Denver Water’s Assessment of Interior Polyurethane Coating of 108 Inch Water Pipeline |
240 | Asset Management of Asbestos Cement Pipes Using Acoustic Methods: Theory and Case Studies |
251 | Risk-Based Linear Asset Management at Fort Collins Utilities |
263 | Sewer Main and Stub Condition Assessment and Repair/Rehabilitation—A Practical Approach |
273 | Education, Training, and Public Involvement A Training Program for Asset Management of Infrastructure Water Pipelines |
283 | Rigor Matrix to Enhance Public Involvement Effectiveness for Infrastructure Projects |
292 | Case Study: Public Involvement Outcomes in Four Seattle Communities Targeted for New Combined Sewer Overflow Facilities |
301 | Geotechnical Considerations for Pipeline Projects Numerical Simulation of Buried Steel Pipelines under Strike-Slip Fault Displacements |
315 | Constrained Modulus of Crushed Rock for Pipeline Embedment |
327 | Finite Element Analyses of Soil-Pipe Behavior in Dry Sand under Lateral Loading |
340 | Mitigating Geohazards along Aging Infrastructure—The Tolt Pipeline |
350 | Development, Procedure, and Results for the Constrained Modulus of Gravel and Crushed Rock Test |
362 | Over or Under: Geotechnical Considerations for Pipeline Levee Crossings |
373 | Contribution of Lateral Earth Pressure Resistance to Restrain Horizontal Thrust in Buried Pipelines |
387 | Pipeline Construction and Rehabilitation Hot Tapping and Plugging in New York City: A Method to Maintain Service and Protect the Marine Environment during Reconstruction of a Major Sewage Pumping Station and Treatment Plant |
397 | The Need for National Data Standards for Condition Assessment |
410 | Internal PCCP Force Main Deterioration—Analysis and Rehabilitation |
420 | Weighing the Risks of Installing a Lake Tap with Microtunneling |
433 | Hole Swallows Car, Film at 11:00: Greensboro’s Pilot Program for Water Pipe Bursting Leads to Expanded City Wide Program |
446 | Pipe Reaming in Seattle |
457 | Rehabilitating a Life Line: Inspecting and Repairing the Hultman Aqueduct in Metropolitan Boston |
470 | Multiple HDD Applications for Portland Airport Deicing Enhancement Project |
483 | Sophisticated Sequencing of Water Transmission Main Repairs |
493 | Engineering Assessment of Damaged 66 Inch Water Main |
506 | Target Values of Compacted Gravel for Pipelines |
516 | Rehabilitation of Brazos River and Colorado River Pipeline Bridges |
528 | Who’s on Your CM Team? |
538 | Pipeline Rehabilitation amidst Environmentally Sensitive Location |
548 | Power Generation Case Study: Feasibility of Carbon Fiber and Alternate Repair Methods |
557 | Successes and Failures in Laying Steel Pipe through Peat |
568 | 10 Years of Learning—The East Boston Branch Sewer Project from Design through Construction |
582 | PPI-BoreAid: A Preliminary Design Tool for Horizontal Directional Drilling using Polyethylene Pipeline |
594 | Breathing New Life into Old Water Pipelines: Renewal Case Studies in the Southeast U.S. |
604 | The Few, the Proud: The Challenge to Upgrade Infrastructure on Active Military Installations and How One Utility Overcame |
611 | Challenges of Large Diameter Horizontal Directional Drills |
622 | Delivery Logistics for the 144 Inch Tawakoni Pipeline |
631 | Quality Assurance Procedures for Repair of Concrete Pressure Pipes with CFRP Composites |
643 | Large Diameter Watermain Condition Assessment and Evaluation |
653 | Spring Valley Outfall Pipeline Rehabilitation |
659 | Innovative Joint Proves Successful in Critical Slipline Project |
666 | Construction of a Deep Water Marine Outfall Using Design-Build Procurement |
680 | Using Design-Build Procurement for a Deep Water Marine Outfall Pipeline |
692 | Pipeline Locating and Inspection Miami-Dade Embarks on a Condition Assessment Journey |
708 | Completing Condition Assessments Using In-Pipe GPR As Pipe Penetrating Radar |
719 | Handling Transmission Mains in Water Loss Control Programs |
729 | Recent Advances in Pipe Wall Assessment Technology |
740 | Deterioration of Two Critical Force Mains |
750 | Applying Subsurface Utility Engineering (SUE) to Transportation Projects: The State of the Practice |
759 | Permanent Leak Detection on Pipes Using a Fibre Optic Based Continuous Sensor Technology |
770 | Transmission Main and Plastic Pipe Leak Detection Using Advanced Correlation Technology: Case Studies |
781 | A Simple Soil-Structure Interaction Model for Indirect Damage Assessment of Segmented Concrete Pipelines during PGD |
792 | Pipeline Planning and Design Lake Oswego’s Innovative Buoyant Interceptor Sewer System Takes Shape |
805 | Creation and Calibration of LWC’s System-Wide Hydraulic Model |
816 | Maxi-HDD Pull Loads in Non-Level Grade for Polyethylene Pipe Including Ballast |
826 | Design and Construction Challenges for a High-Risk, 24 Inch Diameter, 5,400 LF HDD Project |
836 | An Improved Approach for the Design of Thrust Blocks in Buried Pipelines |
855 | When Big Is Too Big—Evaluating 156 Inch Water Main Pipe Materials |
863 | Understanding How Molecular Differences Influence Plastic Pipe Performance |
879 | Analysis and Testing of a Prototype Jointing System for Bar-Wrapped Steel Cylinder Concrete Pressure Pipe |
887 | Review of Performance of Gasketed Joints of Buried Concrete and Steel Pipelines in California after Recent Seismic Events |
897 | Guidelines for Use of Mini-Horizontal Directional Drilling for Placement of High Density Polyethylene Pipe |
907 | A Laboratory Method for Determining the Safe Pull Stress for Directionally Drilled High Density Polyethylene Pipe |
918 | Planning and Building a Marine Outfall in a Sensitive Ecosystem: Lessons Learned |
934 | Large Diameter Steel Pipe Design under Deep Water: Lake Travis Experience |
944 | Answering the Question: Is a Surge Analysis Required? |
952 | Thrust Restraint Design and Analysis for Continuous Pipelines: Case Study of Steel Pipe Using M9, M11, and Fiberglass Analyses |
963 | Design and Installation of Pipeline Systems in Long Tunnels—The Brightwater Conveyance Project |
976 | Common Pitfalls in Hydraulic Design of Large Diameter Pipelines: Case Studies and Good Design Practice |
987 | Hampton Roads Crossing (HRX) Pipeline: Innovative Marine Pipeline Design and World Record Trenchless Crossing |
996 | Planning for a Regional (400+ MGD) Transmission Line |
1007 | A Change in System Supply and Operations |
1017 | Seventy-Two Projects, $600 Million, and 15 Years—Now What? |
1030 | Thrust Restraint Concepts and Beam Loads for Segmented Pipelines at Bends |
1040 | Testing and Evaluation of Statically-Loaded Large Diameter Steel Pipe with Native Backfill Soils |
1050 | Pipe Thrust Restraint Considerations: What You Don’t Find in a Textbook |
1060 | Development of a Testing Protocol for Evaluation of Flexible Lining Materials |
1080 | Solving the “No-Win” Scenario: Mercer Island, Washington Sewer Lakeline Replacement |
1093 | Evaluation of Seven Flexible Linings to Determine Suitability As an Alternative to Mortar Lining |
1111 | The New Mississippi River Bridge: Water Utility Relocations |
1120 | “Insulating” Welded Lap Joints for Steel Pipelines—The End to Internal Coating Repairs? |
1131 | A Review of Available Minor Loss Coefficients for Combining and Dividing Flow Tees |
1139 | A City within a City: The Tale of the Relocation of a Sanitary Sewer Interceptor |
1149 | How to Protect Your Pipeline from Corrosion in a Pipeline Spaghetti Bowl |
1157 | Pipeline Engineering: How to Plan for Everything |
1167 | Approaches to Fatigue Design in Thermoplastic Pipe |
1177 | Design and Construction of a Relief Sewer Siphon under the Santa Clara River by Microtunneling |
1188 | Hydraulic Evaluation and Energy Optimization for a 134 Mile Integrated Raw Water Transmission System |
1198 | The Straw That Stirs the Drink—Designing a Challenging Diversion Pump Station and Force Main for Clackamas County Sanitary District #1, Oregon |
1209 | Best Value on Large Diameter Pipeline Projects by Integrating Design Parameters, Bid Specifications, and Construction Quality Control |
1218 | Innovative Pipeline Cost Estimating for Colorado Water Supply Planning |
1230 | Special Considerations for Protecting Very Long Transmission Mains from Hydraulic Transients |
1240 | Innovative Uses of GIS on the Houston 120 Inch Northeast Transmission Main Feasibility Study |
1249 | Large Diameter Elevated Transmission Pipeline Crossing of the Snohomish River Estuary: A Case Study Addressing Unique Design Challenges |
1261 | An Urban Alignment for a Waterline Up to 156 Inches |
1267 | Effective Early Planning for Pipeline Projects |
1278 | Selection of Conduit Material for the Provo Reservoir Canal Enclosure Project |
1293 | Performance of Gasket Joints in Steel Pressure Pipes |
1303 | Field Performance of Coatings and Linings for Welded Steel Pipe in the Water Industry |
1316 | Comparison of the Mechanical Properties of Steel and Ductile Iron Pipe Materials |
1328 | Acueducto Rio Colorado Tijuana Project |
1337 | Seismic Concerns for the Design of Above Ground Pipe Supports |
1347 | Installing Pipelines with Microtunneling while Successfully Avoiding Claims—A Case History Illustrating the Value of Using Alternative Contracting Methods |
1357 | Transient Pressure Monitoring Results—Nacimiento Water Project |
1367 | Application and Advantages of Using Internally Restrained PVC Pipes for Installation by Horizontal Directional Drilling |
1378 | Regulations, Codes, and Standards Pipeline Planning in the UK: Navigating a Constrained Landscape |
1388 | Permitting Requirements and Expectations for Pipeline Repair: New Expectations for 2011 |
1397 | Environmental Permitting for Pipeline Projects |
1408 | Safety, Risk Assessment, and Management Web Based Risk Assessment of Water and Wastewater Pipeline Failures |
1418 | Assessment Framework for the Impacts of Climate Change and Urbanization on Urban Drainage Systems |
1428 | Verification of PCCP Failure Margin and Risk Curves |
1439 | Bending Behavior of Jointed Ductile Iron Pipelines |
1445 | Pipe Criticality Analysis for Water Distribution Systems |
1457 | Sustainability NIST-VT Workshop on Aging Water Infrastructure |
1468 | Silicone Coating Technology As a Solution to Combat Fouling in Water Transmission Piping |
1478 | Green Stormwater Infrastructure Use to Control Combined Sewer Overflows |