Shopping Cart

No products in the cart.

ASHRAE CommissioningStakeholdersGuide 2018

$45.50

Commissioning Stakeholders’ Guide

Published By Publication Date Number of Pages
ASHRAE 2018 124
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

The Commissioning Stakeholders’ Guide consolidates best practices, sample documentation, and more than 50 project checklists in a practical and applicable resource for this critical aspect of a new construction project.Using ASHRAE Guideline 0 and ASHRAE/IES Standard 202, this guide provides concise guidance and step-by-step requirements for new construction commissioning for owners, designers, and project managers. Systems, including those found in commercial, medical, industrial, and education facilities, are described in detail. Every facet of the commissioning process is outlined, from project initiation to the final commissioning report.Commissioning Stakeholders’ Guide was co-published by ASHRAE, the leading organization in the sustainable built environment, and BCxA, the authority on building commissioning.

PDF Catalog

PDF Pages PDF Title
2 CommissioningStakeholders’Guide
6 Contents
10 Checklists
12 Acknowledgments
14 Preface
16 Chapter 1—Strategic Guide to theCommissioning Process
Introduction to the Commissioning Process
Strategic Overview
17 Use of the Commissioning Process
Value and Benefits of Commissioning
19 Performance Requirements
20 Commissioning Provider Characteristics
21 Commissioning Expectations
References
22 Chapter 2—New ConstructionCommissioning ProcessActivities andDocumentation
The Commissioning Process for New Construction
24 New Construction Commissioning Process Activities and Deliverables
Commissioning Process Documentation Overview
Owner’s Project Requirements
25 Table 2.1 New Construction Commissioning Process Activities, Deliverables, andResponsibilities
26 The Basis of Design
Commissioning Plan
Commissioning Specifications
Design Review Report
Record Documents
27 Systems Manual
Preliminary Commissioning Report
Final Commissioning Report
28 Roster of Participants and Stakeholders
References
29 Table 2.2 Commissioning Process Responsibilities by Activity
30 Table 2.3 Commissioning Team Contact List
32 Chapter 3—Stakeholder/Participant Roles and Responsibilities
New Construction Commissioning Process Responsibility by Document
Stakeholder Project Phase Involvement
Stakeholder Roles and Responsibilities Summary
Owner/Owner’s Representative
33 Table 3.1 Commissioning Documents
35 Architect
Engineer
Contractor/Construction Manager
Table 3.2 Commissioning Team Members by Phase (Stum and Bjornskov 2017)
36 Subcontractors and Installers
Manufacturer and Supplier
Commissioning Provider
LEED® or Program Administrator
Stakeholder Duties and Functions
37 Owner/Owner’s Representative
38 Architect
39 Design Engineers (Mechanical, Elecctrical, Plumbing, Enclosure, and Others Included in the Design Process)
Contractor/Construction Manager
41 Subcontractor and Installer
Manufacturer and Supplier
42 Commissioning Provider
43 LEED or Program Administrator
References
44 Table 3.3 Owner’s Roles and Responsibilities Checklist
45 Table 3.4 Architect’s Roles and Responsibilities Checklist
46 Table 3.5 Design Engineer Roles and Responsibilities Checklist
47 Table 3.6 Contractor/Construction Manager Roles and Responsibilities Checklist
48 Table 3.7 Subcontractor and Installer Roles and Responsibilities Checklist
49 Table 3.8 Manufacturer and Supplier Roles and Responsibilities Checklist
50 Table 3.9 Commissioning Provider Roles and Responsibilities Checklist
51 Table 3.10 LEED® or Program Administrator Roles and Responsibilities Checklist
52 Chapter 4—Commissioning for Codes and Standards Requirements
Basic Commissioning Process to Code Requirements
Commissioning Application for Construction Projects Using IECC
53 Building Official and AHJ Role in Commissioning
Commissioning Process for Building Permit
54 Commissioning Checklist for Permit
IECC Commissioning Documentation for Final Inspection and Certificate of Occupancy
55 Table 4.1 Commissioning Documentation for Permit
56 Commissioning Report Outlines
References
57 Table 4.2 Commissioning Documentation for Final Inspection and Certificate of Occupancy
58 Chapter 5—Building System Selectionfor Commissioning
Basic Commissioning Activities
Building System Commissioning Checklists
59 Table 5.1 Commercial and Office Buildings—Systems to Commission
60 Table 5.2 Medical Buildings and Hospitals—Systems to Commission
61 Table 5.3 Educational Facilities—Pre-K–12 Schools—Systems to Commission
62 Table 5.4 College and University Facilities—Systems to Commission
63 Table 5.5 Municipal and State Buildings—Systems to Commission
64 Table 5.6 Federal Buildings—Systems to Commission
65 Table 5.7 Industrial Facilities—Systems to Commission
66 Table 5.8 High-Rise Residential Buildings—Systems to Commission
67 Table 5.9 Retail Buildings and Areas—Systems to Commission
68 Table 5.10 Justice Buildings—Systems to Commission
70 Chapter 6—Building System Commissioning Requirements
Commissioning Major Specialty Task Selection
Building Enclosures
Air-Conditioning and Ventilation Systems
71 Plumbing Systems
Electric Power Systems
Lighting and Control Systems
Energy Monitoring and Management Systems
Indoor Environmental Quality
Landscape Irrigation Systems
72 Fire Protection Systems
Fire Alarm Systems
Vertical Transportation Systems
On-Site Energy Generation Systems
Telephone and Communication Systems
References
73 Table 6.1 Building Enclosure Commissioning
74 Table 6.2 Air-Conditioning and Ventilation Systems Commissioning
76 Table 6.3 Plumbing Commissioning
77 Table 6.4 Electrical Power Systems Commissioning
78 Table 6.5 Lighting and Control Systems Commissioning
79 Table 6.6 Energy Monitoring and Management Commissioning
80 Table 6.7 Indoor Environmental Quality Commissioning
81 Table 6.8 Landscape Irrigation Systems Commissioning
82 Table 6.9 Fire Protection Systems Commissioning
83 Table 6.10 Fire Alarm Systems Commissioning
85 Table 6.11 Vertical Transportation Systems Commissioning
86 Table 6.12 On-Site Energy Generation System Commissioning
87 Table 6.13 Telephone and Communication Systems Commissioning
88 Chapter 7—Selecting and Hiring a Commissioning Provider
Guidelines for Qualifications and Independence of Approved Commissioning Providers
89 Qualifications-Based Selection
Owners and Commissioning Providers: You Need QBS
92 References
94 Appendix A—Commissioning Process Definitions and Resources
Commissioning Definitions (ASHRAE/IES Standard 202)
96 Commissioning Organizations and Resources
REFERENCE
98 Appendix B—Commissioning Process Documentation: New Construction Checklists
New Construction Commissioning Documentation Checklists
Owner’s Project Requirements (OPR) Document
OPR Documentation Development
99 Commissioning Plan
Commissioning Plan Contents
100 Basis of Design (BoD)
101 Commissioning Specifications
Specifications for the Commissioning Process
Project Documents, Submittal Review, and Reports
102 Design Submissions
104 Construction Observation, Testing, Checklists, and Reports
105 Issues and Resolution Log
Contents
Systems Manual
106 Training Plan and Records
Commissioning Process Reports and Testing Records
References
108 Table B.1 Commissioning Documentation
109 Table B.2 Owner’s Project Requirements
110 Table B.3 Preliminary Commissioning Plan
111 Table B.4 Final Commissioning Plan
112 Table B.5 Basis of Design
113 Table B.6 Commissioning Specifications in Construction Documents
114 Table B.7 Design Review Commissioning
115 Table B.8 Commissioning Submittal Review
116 Table B.9 Commissioning Observation and Testing Report
117 Table B.10 Equipment and Assemblies Tested
118 Table B.11 Sample Commissioning Issues and Resolution Log
119 Table B.12 Commissioning Issues and Resolution Log
120 Table B.13 Systems Manual
121 Table B.14 Training Plan
122 Table B.15 Commissioning Documentation for Final Inspection and Certificate of Occupancy
123 Table B.16 Final Commissioning Report
ASHRAE CommissioningStakeholdersGuide 2018
$45.50