Shopping Cart

No products in the cart.

ASTM-E2452 2005

$40.63

E2452-05 Standard Practice for Equipment Management Process Maturity (EMPM) Model

Published By Publication Date Number of Pages
ASTM 2005 7
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

1.1 This practice covers a process for the assessment and reporting of an entitys overall equipment management process maturity (EMPM).

1.2 The highest value is placed on continuous improvement as reflected in measured increases in maturity over time.

1.3 The EMPM model is designed to be applicable and appropriate for all equipment-holding entities, however, the EMPM may not be the only acceptable assessment model available.

1.4 It includes all aspects of equipment management.

1.5 In addition to applicability to equipment and equipment management as defined in this practice, this practice may in whole or in part be effectively applied to intangible property, real property, and material.

1.6 There is great variation across organizations regarding the internal departments that accomplish the various aspects of equipment management. Thus, all criteria are not applicable to all entities.

1.7 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

PDF Catalog

PDF Pages PDF Title
1 Scope
Referenced Documents
Terminology
2 Summary of Practice
Significance and Use
TABLE 1
TABLE 2
3 Applicability
Levels of Equipment Management Activity
5 Equipment Life-Cycle Phases—The Equipment Life Cycle Encompasses Acquisition, Use, and Disposition Phases
TABLE 3
TABLE 4
6 Assessments
TABLE 5
TABLE 6
7 Assessment Measures
Keywords
TABLE 7
TABLE 8
ASTM-E2452 2005
$40.63