This PAS gives recommendations for the mitigation and recovery of buildings damaged by water. It is applicable to all forms of water damage to buildings.

It covers the mitigation and recovery process including:

  1. initial inspection of a water damaged building;

  2. setting drying and cleaning goals (including air quality goals);

  3. selecting the drying and cleaning techniques and equipment to be used;

  4. monitoring the drying and cleaning progress;

  5. verifying drying and cleaning goals have been met;

  6. documentation for provision to the customer.

It also provides further guidance to support the application of this PAS including descriptions of techniques and equipment in current use, example forms and example calculations.

This PAS does not cover building repair and reinstatement. However, it is recognized that the restorative drying process is a primary stage of the overall repair and reinstatement process.

It does not cover the restoration of contents other than the implications for drying or restoring the building.

It is for use by restorers and may be of interest to building owners and occupiers, insurance companies and their representatives and those involved in the subsequent repair and reinstatement of a building.

PDF Catalog

PDF Pages PDF Title
3 Contents
5 Foreword
6 Introduction
7 1 Scope
2 Terms and definitions
11 3 Mitigation and recovery process
16 4 Documentation for provision to the customer
17 5 Building repair and reinstatement
18 Annex A (informative) The initial inspection
25 Annex B (informative) Sources of water damage and their health risks for occupants
27 Annex C (informative) Surveying for practical moisture measurement thresholds
28 Annex D (informative) Drying goal recording document
29 Annex E (informative) Moisture measurement
33 Annex F (informative) General decontamination clearance – Achieving the cleaning goal
36 Annex G (informative) Indoor air quality
38 Annex H (informative) Drying methods, systems and equipment
43 Annex I (informative) Example environmental impact assessment
44 Annex J (informative) Cost benefit calculation assessment
47 Annex K (informative) Drying goal data
49 Annex L (informative) Example completion certificate
50 Annex M (informative) Example of an information leaflet for building owners/occupiers
53 Bibliography