Shopping Cart

No products in the cart.

IEEE 1068-2015

$59.58

IEEE Standard for the Repair and Rewinding of AC Electric Motors in the Petroleum, Chemical, and Process Industries

Published By Publication Date Number of Pages
IEEE 2015 90
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Revision Standard – Active. This standard is intended to be a basic or primary document that can be utilized and referenced by owners of ac motors and generators (machines) that need refurbishment, repair, and/or rewinding, as well as service or repair facilities. It has been developed for the petroleum, chemical, and process industries, and it may be adapted to other areas of interest. The use of this standard is expected to result in higher quality and more cost-effective, timely repairs. A means of evaluating work performed and repair or service facilities is also provided.

PDF Catalog

PDF Pages PDF Title
1 IEEE Std 1068™-2015 Front Cover
2 Title page
4 Important Notices and Disclaimers Concerning IEEE Standards Documents
7 Participants
8 Introduction
9 Contents
11 IMPORTANT NOTICE
1. Overview
1.1 Scope
12 1.2 Purpose
2. Normative references
14 3. Definitions
15 4. Responsibilities
16 4.1 User responsibility
18 4.2 Repair facility responsibility
5. Preliminary assessment
5.1 Initial receipt
20 5.2 Incoming tests
21 5.3 Initial run check
23 6. Condition and damage appraisal
6.1 Component marking and evaluation
26 6.2 Detailed mechanical evaluation
33 6.3 Detailed electrical evaluation
39 6.4 Other
7. Cleaning and reconditioning
7.1 General
40 7.2 Reconditioning of flooded motors
41 8. Facility repair or refurbishment period
8.1 Receiving
8.2 Stripping
42 8.3 Stator and rotor lamination evaluation
43 8.4 Description of winding types
44 8.5 Replacement of coils
55 8.6 Bearing replacement and restoration of rotational fits and seals
58 8.7 Balancing
59 8.8 Electrical connections
60 8.9 Mechanical fits
61 8.10 Painting
8.11 Permanent magnet rotors
62 8.12 Miscellaneous
63 8.13 Final test
65 8.14 Shipping precautions
9. Field repairs
10. Post repair
10.1 Repair facility
10.2 User handling
67 Annex A (informative) Bibliography
69 Annex B (informative) Typical repair facility evaluation form
79 Annex C (informative) In-plant motor evaluation
81 Annex D (normative) Motor repair form (to be completed by owner)
83 Annex E (normative) Condition report forms
87 Annex F (informative) Magnetic wedges
88 Annex G (informative) Repair checklist
90 Back Cover
IEEE 1068-2015
$59.58