Shopping Cart

No products in the cart.

IEEE 1526 2004

$44.96

IEEE Recommended Practice for Testing the Performance of Stand-Alone Photovoltaic Systems

Published By Publication Date Number of Pages
IEEE 2004 27
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

New IEEE Standard – Active. This recommended practice presents tests to determine the performance of stand-alone photovoltaic (PV) systems and for verifying PV system design. These tests apply only to complete systems with a defined load. Performance testing is conducted outdoors under prevailing conditions over a period of about one month. These tests are intended to assist designers, manufacturers, system integrators, system users, and laboratories that will conduct the tests. System safety and component reliability issues are not addressed in this recommended practice.

PDF Catalog

PDF Pages PDF Title
1 Cover
2 IEEE Recommended Practice for Testing the Performance of Stand-Alone Photovoltaic Systems
5 Introduction
Participants
7 Contents
10 1. Overview

1.1 Scope

1.2 Purpose
11 1.3 Limitations

2. Definitions
12 3. Testing methodology

3.1 Testing overview

3.2 PV system and test requirements
13 3.3 Test report and documentation

4. System inspection
4.1 System documentation review
14 4.2 Initial system hardware inspection

5. Data acquisition system (DAS) and PV system installation
5.1 DAS specifications and installation
16 5.2 PV system installation
17 6. System performance tests
18 6.1 Battery preparation

6.2 Initial functional test (FTI)

6.3 Initial usable battery capacity test (UBCI)

6.4 Initial recovery test (RTI)
19 6.5 Final functional test (FTF)
20 6.6 Final recovery test (RTF)

6.7 Final usable battery capacity test (UBCF)
21 6.8 Final battery charge

7. Final system inspection

7.1 System maintenance procedure review

7.2 Visual inspection

7.3 Wiring inspection
22 8. Array I-V curve (optional)

9. System pass/fail test criteria

9.1 System and load operation
9.2 PV array
9.3 Minimum UBC

9.4 Change in usable battery capacity
23 Annex A—Bibliography
25 Annex B—Sample system summary
IEEE 1526 2004
$44.96