IEEE 1665 2010
$45.50
IEEE Guide for the Rewind of Synchronous Generators, 50 Hz and 60 Hz, Rated 1 MVA and Above
Published By | Publication Date | Number of Pages |
IEEE | 2010 | 110 |
New IEEE Standard – Active. The general parameters for this guide apply to 50 Hz or 60 Hz synchronous generators driven by reciprocating engines, steam turbines, combustion turbines, and hydro turbines. The guide generally applies to the stator and rotor of generators with rated outputs of 1 MVA and above. The guide does not address machine auxiliaries or the excitation system.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std 1665-2009 Front Cover |
3 | Title Page |
6 | Introduction Notice to users Laws and regulations Copyrights |
7 | Updating of IEEE documents Errata Interpretations Patents |
8 | Participants |
10 | Contents |
13 | Important Notice 1. Overview 1.1 Scope 1.2 Purpose |
14 | 1.3 Cautions 2. Normative references |
15 | 3. Definitions; acronyms, and abbreviations; and special terms 3.1 Definitions |
16 | 3.2 Acronyms and abbreviations 3.3 Special terms |
17 | 4. General issues, strategies, and objectives for rewinding 4.1 General 4.2 Future operating modes 4.3 Reliability issues |
18 | 4.4 Competitive bidding |
19 | 4.5 Generator capability issues |
21 | 5. Generator stator winding considerations 5.1 General 5.2 Winding design considerations 5.3 Stator bar construction |
23 | 5.4 Winding groundwall insulation |
24 | 5.5 Generator end winding and connection rings support |
25 | 5.6 Slot support systems 5.7 Series/phase electrical connections and insulation |
26 | 6. Generator rotor considerations 6.1 Cylindrical rotors |
29 | 6.2 Salient-pole rotors |
31 | 7. Writing the technical specification 7.1 General |
32 | 7.2 Objective 7.3 Project description 7.4 Definitions 7.5 Scope |
33 | 7.6 Work conditions 7.7 Foreign material exclusion |
34 | 7.8 Deliverables 7.9 Commercial issues 7.10 Attachments 8. Testing 8.1 General 8.2 Stator core |
35 | 8.3 Stator winding |
38 | 8.4 Rotor winding |
39 | 8.5 Other tests |
40 | Annex A (informative) Bibliography |
42 | Annex B (informative) Glossary of commonly used generator terms |
51 | Annex C (informative) Generator components and auxiliaries C.1 Stator frame and core [turbo-generators] |
52 | C.2 Stator frame and core [hydrogenerators] |
55 | C.3 Generator monitoring instrumentation |
59 | Annex D (informative) Stator rewind information D.1 Coil construction D.2 Stator winding insulation |
64 | D.3 End winding support (for hydrogenerators) D.4 Stator slot support systems |
66 | Annex E (informative) Cylindrical rotor rewind information E.1 Rotor forgings |
68 | E.2 Rotor winding |
74 | Annex F (informative) Salient-pole rotor rewind information F.1 Shaft F.2 Rotor construction |
75 | F.3 Rotor windings |
76 | F.4 Rotor electrical connections |
77 | Annex G (informative) Information typically supplied in a specification by Owner or Vendor |
80 | Annex H (informative) Typical preparations for a rewind specification H.1 General |
81 | H.2 Stator rewind |
83 | H.3 Rotor rewind |
84 | Annex I (informative) Typical stator rewind specification for turbo-generators I.1 Description of the project |
85 | I.2 Machine data I.3 Owner’s responsibility (as required) I.4 Requirements |
90 | Annex J (informative) Typical rotor rewind specification for turbo-generators J.1 Description of the project |
92 | J.2 Scope of work and supplies |
95 | J.3 Supplemental work conditions |
96 | J.4 Job progress J.5 Deliverables |
97 | J.6 Commercial J.7 Attachments |
98 | Annex K (informative) Typical stator rewind specification for hydrogenerator K.1 Description of the project |
101 | K.2 General requirements* |
103 | K.3 Material requirements* |
104 | K.4 Required information |
105 | K.5 Tests |
106 | K.6 Warranty |
107 | Annex L (informative) Typical rotor rewind specification for hydrogenerators L.1 Description of the project |
108 | L.2 Rotor rim/spider cleaning |
109 | L.3 Material requirements and workmanship L.4 Testing |
110 | L.5 Required information* L.6 Shipping L.7 Warranty |