IEEE 8802-1CM:2019/Amd1-2021
$35.75
IEEE/ISO/IEC International Standard-Telecommunications and information exchange between information technology systems–Requirements
for local and metropolitan area networks–Part 1CM:Time-sensitive networking for fronthaul – AMENDMENT 1: Enhancements to fronthaul profiles to support new fronthaul interface, synchronization, and syntonization standards
Published By | Publication Date | Number of Pages |
IEEE | 2021 |
Adoption Standard – Active. Enhancements to fronthaul profiles are defined in this amendment to IEEE Std 802.1CM(TM)-2018 in order to address new developments in fronthaul interface standards and in related synchronization and syntonization standards.
PDF Catalog
PDF Pages | PDF Title |
---|---|
4 | Blank Page |
5 | Title page |
7 | Important Notices and Disclaimers Concerning IEEE Standards Documents |
10 | Participants |
12 | Introduction |
13 | Contents |
14 | 1. Overview 1.3 Introduction |
15 | 2. Normative references |
16 | 3. Definitions |
17 | 4. Acronyms and abbreviations |
18 | 5. Conformance 5.3 Bridge requirements 5.3.1 Common bridge requirements 5.4 Bridge options 5.4.1 Bridge requirements for Profile B 5.4.2 Bridge requirements for synchronization |
19 | 5.6 End station options 5.6.1 End station requirements for time synchronization |
20 | 6. Fronthaul 6.1 Evolved Universal Terrestrial Radio Aaccess technology background 6.2 Class 1 requirements 6.2.3 IQ data requirements 6.2.3.1 Latency |
21 | 6.3 Class 2 requirements 6.3.1 eCPRI background 6.3.2 User Plane data requirements 6.3.2.1 Latency |
22 | 6.3.3 Control and Management Plane data requirements 6.3.3.1 Latency |
23 | 6.3.3.2 Frame Loss Ratio 6.4 Synchronization requirements 6.4.1 Time synchronization requirements |
25 | 6.4.1.1 6.4.1.2 Category A 6.4.1.2 6.4.1.3 Category B |
26 | 6.4.2 Frequency synchronization requirements |
27 | 7. Bridge and synchronization functions 7.3 Frame preemption 7.4 Network synchronization |
29 | 8. Fronthaul profiles 8.1 Profile A 8.1.3 Meeting latency targets |
30 | 8.2 Profile B 8.2.3 Meeting latency targets |
31 | 9. Synchronization solutions 9.1 9.2 Solutions for Category A |
32 | Annex A (normative) PCS proforma— Time-sensitive networking for Fronthaul Profiles A.7 Bridge requirements |
35 | A.8 End station requirements |
36 | Annex C (informative) Fronthaul interfaces |
37 | Annex D (informative) Bibliography |