IEEE IEC 61850 9 3 2016
$28.17
IEC/IEEE International Standard – Communication networks and systems for power utility automation – Part 9-3: Precision time protocol profile for power utility automation
Published By | Publication Date | Number of Pages |
IEEE | 2016 | 18 |
New IEEE Standard – Active.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEC/IEEE 61850-9-3-2016 Front Cover |
4 | CONTENTS |
5 | FOREWORD |
7 | INTRODUCTION |
8 | 1 Scope 2 Normative references 3 Terms, definitions, abbreviations, acronyms, and conventions 3.1 Terms and definitions |
10 | 3.2 Abbreviations and acronyms 4 Identification 5 Clock types |
11 | 6 Protocol specifications 7 Requirements 7.1 Measurement conditions 7.2 Network time inaccuracy |
12 | 7.3 Network elements 7.4 Requirements for grandmasters 7.4.1 Grandmaster time inaccuracy 7.4.2 Grandmaster holdover 7.4.3 Grandmaster clockQuality in start-up, holdover and recovery 7.4.4 Grandmaster traceable flags 7.5 Requirements for TCs |
13 | 7.6 Requirements for BCs 7.6.1 BC time inaccuracy 7.6.2 BC as free-running grandmaster 7.6.3 BC as master in holdover 7.7 Requirements for media converters 7.8 Requirements for links |
14 | 7.9 Network engineering |
15 | 8 Default settings 9 Redundant clock handling 10 Protocol Implementation Conformance Statement (PICS) 10.1 Conventions Table 1 – PTP attributes for the power utility automation profile |
16 | 10.2 PICS Table 2 – PICS for clocks |