{"id":112080,"date":"2024-10-18T16:21:08","date_gmt":"2024-10-18T16:21:08","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1332-2013\/"},"modified":"2024-10-24T22:03:40","modified_gmt":"2024-10-24T22:03:40","slug":"ieee-1332-2013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1332-2013\/","title":{"rendered":"IEEE 1332 2013"},"content":{"rendered":"

Revision Standard – Active. A standard set of reliability program objectives for use between customers and producers, or within product development teams, to express reliability program requirements early in the development phase of electronic products and systems is provided in this document.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nIEEE Std 1332-2012 Front cover
\n <\/td>\n<\/tr>\n
3<\/td>\nTitle page <\/td>\n<\/tr>\n
6<\/td>\nNotice to users
Laws and regulations
Copyrights
Updating of IEEE documents
Errata <\/td>\n<\/tr>\n
7<\/td>\nPatents <\/td>\n<\/tr>\n
8<\/td>\nParticipants <\/td>\n<\/tr>\n
10<\/td>\nIntroduction <\/td>\n<\/tr>\n
11<\/td>\nContents <\/td>\n<\/tr>\n
13<\/td>\nImportant notice
1. Overview
1.1 Scope
1.2 Purpose <\/td>\n<\/tr>\n
14<\/td>\n1.3 Objectives of a reliability program
2. Supplier\u2019s reliability program <\/td>\n<\/tr>\n
15<\/td>\n3. The first objective \u2014 requirements
3.1 Background <\/td>\n<\/tr>\n
16<\/td>\n3.2 Reliability requirements <\/td>\n<\/tr>\n
17<\/td>\n3.3 Planning <\/td>\n<\/tr>\n
18<\/td>\n3.4 Training <\/td>\n<\/tr>\n
19<\/td>\n3.5 Additional communication
4. The second objective \u2014 engineering
4.1 Background <\/td>\n<\/tr>\n
20<\/td>\n4.2 Parts, materials, and process selection
4.3 Designing for reliability within item life conditions
4.4 Assessing reliability capability of the supply chain <\/td>\n<\/tr>\n
21<\/td>\n4.5 Identifying the critical-failure mechanisms
4.6 Applying physics-of-failure principles <\/td>\n<\/tr>\n
22<\/td>\n4.7 Reliability testing
5. The third objective \u2014 feedback
5.1 Background <\/td>\n<\/tr>\n
23<\/td>\n5.2 Verification and validation
5.3 Failure data tracking and analysis
5.4 Reliability improvement <\/td>\n<\/tr>\n
25<\/td>\nAnnex A (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Standard Reliability Program for the Development and Production of Electronic Products<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2013<\/td>\n25<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":112081,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-112080","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/112080","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/112081"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=112080"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=112080"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=112080"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}