{"id":180363,"date":"2024-10-19T11:15:45","date_gmt":"2024-10-19T11:15:45","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-311-7-18\/"},"modified":"2024-10-25T03:33:07","modified_gmt":"2024-10-25T03:33:07","slug":"aci-311-7-18","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-311-7-18\/","title":{"rendered":"ACI 311.7 18"},"content":{"rendered":"
This reference specification covers quality assurance inspection services for preplacement, placement, and post-placement of concrete construction. This reference specification can be made applicable to a particular construction project by citing it in the inspection services contract. The specifier shall supplement the provisions of this reference specification as needed by specifying individual project requirements in the inspection services contract. The materials, processes, quality control measures, and inspections described in this specification should be tested, monitored, or performed as applicable only by individuals holding the appropriate ACI Certifications or equivalent. Keywords: accreditation; certification; concrete construction; inspection agency; placement; post-placement; preplacement; special inspection; specification.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
3<\/td>\n | TITLE PAGE <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | SECTION 1\u2014GENERAL REQUIREMENTS 1.1\u2014Scope 1.2\u2014Units of measurement 1.3\u2014Referenced standards 1.4\u2014Definitions <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 1.5\u2014Reporting requirements 1.6\u2014Qualifications 1.7\u2014Items requiring inspection SECTION 2\u2014PREPLACEMENT INSPECTION 2.1\u2014General requirements 2.2\u2014Formwork, shoring, and embedments <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 2.3\u2014Mild steel reinforcement 2.4\u2014Bonded post-tensioned steel reinforcement <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 2.5\u2014Unbonded post-tensioned steel reinforcement 2.6\u2014Stressing and grouting SECTION 3\u2014PLACEMENT INSPECTION 3.1\u2014Concrete quality 3.2\u2014Conveyance and placement 3.3\u2014Consolidation 3.4\u2014Finishing SECTION 4\u2014POST-PLACEMENT INSPECTION 4.1\u2014Protection and curing 4.2\u2014Forms, shore removal, and reshoring <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 4.3\u2014Strength test specimens SECTION 5\u2014CONCRETE ANCHORS 5.1\u2014General SECTION 6\u2014ERECTION OF PRECAST CONCRETE SECTION 7\u2014SHOTCRETE NOTES TO SPECIFIERS General notes Foreword to checklists <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ACI 311.7-18: Specification for Inspection of Concrete Construction<\/b><\/p>\n |