{"id":313233,"date":"2024-10-19T21:33:34","date_gmt":"2024-10-19T21:33:34","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-11298-32018-tc\/"},"modified":"2024-10-25T19:37:53","modified_gmt":"2024-10-25T19:37:53","slug":"bs-en-iso-11298-32018-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-11298-32018-tc\/","title":{"rendered":"BS EN ISO 11298-3:2018 – TC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
33<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | European foreword <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 3 Terms and definitions 3.1 General 3.2 Techniques <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 3.3 Characteristics 3.4 Materials 3.5 Product stages 3.6 Service conditions <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 3.7 Joints 4 Symbols and abbreviated terms 4.1 Symbols 4.2 Abbreviated terms <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 5 Pipes at the \u201cM\u201d stage 5.1 Materials 5.1.1 Virgin material 5.1.2 Reprocessable and recyclable material 5.2 General characteristics 5.2.1 Appearance 5.2.2 Colour 5.3 Material characteristics <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 5.4 Geometric characteristics 5.5 Mechanical characteristics 5.6 Physical characteristics 5.7 Jointing 5.8 Marking 5.9 Regional requirements for pipes <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 6 Fittings at the \u201cM\u201d stage 6.1 Requirements 6.2 Marking 6.3 Regional requirements for fittings 7 Ancillary components 8 Fitness for purpose of the installed lining system at the \u201cI\u201d stage 8.1 Materials 8.2 General characteristics 8.3 Material characteristics 8.4 Geometric characteristics <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 8.5 Mechanical characteristics <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 8.6 Physical characteristics 8.7 Additional characteristics 8.8 Sampling 8.9 Regional requirements for the installed lining system 9 Installation practice 9.1 Preparatory work 9.2 Storage, handling and transport of pipes and fittings <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 9.3 Equipment 9.3.1 Butt fusion and debeading equipment 9.3.2 Reduction equipment 9.3.3 Pipe skids\/rollers 9.3.4 Winching and rod-pulling equipment <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 9.3.5 Pipe entry guides 9.3.6 Reforming equipment 9.3.7 Electrofusion equipment 9.3.8 Inspection equipment 9.3.9 Lifting equipment <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 9.4 Installation 9.5 Process-related inspection and testing 9.6 Lining termination <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 9.7 Reconnection to the existing pipeline system 9.8 Final inspection and testing 9.9 Documentation <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | Annex A (normative) Factory-folded heat-reverted polyethylene (PE) pipe \u2014 Determination of memory ability <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Plastics piping systems for renovation of underground water supply networks – Lining with close-fit pipes<\/b><\/p>\n |