{"id":360120,"date":"2024-10-20T01:29:21","date_gmt":"2024-10-20T01:29:21","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-1496-22018-tc\/"},"modified":"2024-10-26T02:14:36","modified_gmt":"2024-10-26T02:14:36","slug":"bs-iso-1496-22018-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-1496-22018-tc\/","title":{"rendered":"BS ISO 1496-2:2018 – TC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
94<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
101<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | 4 Classification 5 Marking 6 Dimensions and ratings 6.1 External dimensions <\/td>\n<\/tr>\n | ||||||
104<\/td>\n | 6.2 Internal dimensions 6.3 Ratings <\/td>\n<\/tr>\n | ||||||
105<\/td>\n | 7 Design requirements 7.1 General <\/td>\n<\/tr>\n | ||||||
106<\/td>\n | 7.2 Corner fittings 7.3 Base structure <\/td>\n<\/tr>\n | ||||||
107<\/td>\n | 7.4 End structure 7.5 Side wall structure 7.6 Walls 7.7 Door opening 7.8 Sanitary and taint-free requirements 7.9 Requirements for optional features 7.9.1 Fork-lift pockets <\/td>\n<\/tr>\n | ||||||
108<\/td>\n | 7.9.2 Gooseneck tunnels 7.9.3 Drains 7.9.4 Water connections 7.9.5 Picture frames 7.9.6 Modified\/controlled atmospheres 7.9.7 Fresh air ventilation control 7.9.8 Humidity control <\/td>\n<\/tr>\n | ||||||
109<\/td>\n | 7.9.9 Load line 7.9.10 Floor 7.9.11 Air circulation 8 Testing 8.1 General <\/td>\n<\/tr>\n | ||||||
110<\/td>\n | 8.2 Test No. 13 \u2014 Airtightness test 8.2.1 General <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | 8.2.2 Procedure 8.2.3 Requirements 8.3 Test No. 14 \u2014 Heat leakage test 8.3.1 General <\/td>\n<\/tr>\n | ||||||
112<\/td>\n | 8.3.2 Procedure <\/td>\n<\/tr>\n | ||||||
114<\/td>\n | 8.3.3 Heat leakage calculation 8.3.4 Requirements 8.4 Test No. 15 a) \u2014 Test of the performance of a thermal container under refrigeration by a mechanical refrigeration unit (MRU) 8.4.1 General <\/td>\n<\/tr>\n | ||||||
115<\/td>\n | 8.4.2 Test conditions 8.4.3 Test procedure 8.4.4 Requirements <\/td>\n<\/tr>\n | ||||||
116<\/td>\n | 8.5 Test No. 15 b) \u2014 Functional test of a thermal container at high ambient temperatures while being cooled by a mechanical refrigeration unit (MRU) 8.5.1 General 8.5.2 The thermal container shall be equipped with instruments for the measurement of: 8.5.3 Test conditions 8.5.4 Test procedure <\/td>\n<\/tr>\n | ||||||
117<\/td>\n | 8.5.5 Requirements 8.6 Test No. 15 c) \u2014 Energy consumption of a thermal container at defined ambient temperatures while being cooled by a mechanical refrigeration unit (MRU) 8.6.1 General 8.6.2 The thermal container shall be equipped with instruments for the measurement of: 8.6.3 Test conditions <\/td>\n<\/tr>\n | ||||||
118<\/td>\n | 8.6.4 Test procedure 8.6.5 Requirements 8.7 Test No. 16 \u2014 Strength of mounting devices for removable equipment (where fitted) 8.7.1 General 8.7.2 Test No. 16 a) \u2014 Vertical loading <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | 8.7.3 Test No. 16 b) \u2014 Horizontal loading 9 Electrical aspects of thermal containers 9.1 General <\/td>\n<\/tr>\n | ||||||
120<\/td>\n | 9.2 General requirements for standard voltage equipment <\/td>\n<\/tr>\n | ||||||
121<\/td>\n | 9.3 Remote condition monitoring <\/td>\n<\/tr>\n | ||||||
122<\/td>\n | Annex A (normative) Requirements for cooling water connections <\/td>\n<\/tr>\n | ||||||
125<\/td>\n | Annex B (informative) Picture frames <\/td>\n<\/tr>\n | ||||||
127<\/td>\n | Annex C (normative) Air temperature measurement points <\/td>\n<\/tr>\n | ||||||
129<\/td>\n | Annex D (normative) Phase connections to container plugs and sockets <\/td>\n<\/tr>\n | ||||||
131<\/td>\n | Annex E (normative) Electric plug and socket, four-pin, 380\/440 V, 50\/60 Hz, 32 A <\/td>\n<\/tr>\n | ||||||
135<\/td>\n | Annex F (informative) Electrical power supplies for thermal containers (9.2) <\/td>\n<\/tr>\n | ||||||
136<\/td>\n | Annex G (normative) General requirements for 220 V and dual voltage equipment <\/td>\n<\/tr>\n | ||||||
137<\/td>\n | Annex H (informative) MRU Nose Mounted Frame (Optional Backup Generator Set) <\/td>\n<\/tr>\n | ||||||
138<\/td>\n | Annex I (informative) Ageing of polyurethane foam <\/td>\n<\/tr>\n | ||||||
144<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Series 1 freight containers. Specification and testing – Thermal containers<\/b><\/p>\n |