{"id":398675,"date":"2024-10-20T04:37:55","date_gmt":"2024-10-20T04:37:55","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-16326-2019\/"},"modified":"2024-10-26T08:25:32","modified_gmt":"2024-10-26T08:25:32","slug":"ieee-16326-2019","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-16326-2019\/","title":{"rendered":"IEEE 16326-2019"},"content":{"rendered":"

Revision Standard – Active. This document provides normative content specifications for project management plans concerned with systems, and software systems. This document also provides detailed discussion and advice on applying a set of technical management processes that are common to both the system and software life cycles as covered by ISO\/IEC\/IEEE 15288 and ISO\/IEC\/IEEE 12207 respectively. The discussion and advice are intended to aid in the preparation of the normative content of project management plans.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nFront cover <\/td>\n<\/tr>\n
3<\/td>\nContents <\/td>\n<\/tr>\n
5<\/td>\nForeword <\/td>\n<\/tr>\n
7<\/td>\nIntroduction <\/td>\n<\/tr>\n
9<\/td>\n1 Scope
1.1 Purpose
1.2 Field of application
1.3 Limitations
2 Normative References <\/td>\n<\/tr>\n
10<\/td>\n3 Terms, definitions and abbreviated terms
3.1 Terms and definitions
3.2 Abbreviated terms
4 Conformance
4.1 General
4.2 Conformance to the normative documentation content
4.3 Conformance to processes <\/td>\n<\/tr>\n
11<\/td>\n4.4 Full conformance
5 Application of this document
6 Technical management processes
6.1 General <\/td>\n<\/tr>\n
13<\/td>\n6.2 Project planning process
6.2.1 General
6.2.2 Guidance <\/td>\n<\/tr>\n
16<\/td>\n6.2.3 Software-specific guidance <\/td>\n<\/tr>\n
17<\/td>\n6.3 Project assessment and control process
6.3.1 General
6.3.2 Guidance <\/td>\n<\/tr>\n
19<\/td>\n6.4 Decision management process
6.4.1 General
6.4.2 Guidance <\/td>\n<\/tr>\n
21<\/td>\n6.5 Risk management process
6.5.1 General
6.5.2 Guidance <\/td>\n<\/tr>\n
22<\/td>\n6.6 Configuration management process
6.6.1 General
6.6.2 Guidance <\/td>\n<\/tr>\n
23<\/td>\n6.7 Information management process
6.7.1 General
6.7.2 Guidance <\/td>\n<\/tr>\n
24<\/td>\n6.8 Measurement process
6.8.1 General
6.8.2 Guidance <\/td>\n<\/tr>\n
25<\/td>\n6.9 Quality assurance process
6.9.1 General
6.9.2 Guidance <\/td>\n<\/tr>\n
26<\/td>\n7 Elements of the project management plan
7.1 General
7.2 Front matter
7.3 Project overview
7.3.1 Project summary <\/td>\n<\/tr>\n
27<\/td>\n7.4 References
7.5 Definitions <\/td>\n<\/tr>\n
28<\/td>\n7.6 Project context
7.6.1 Process model
7.6.2 Process improvement
7.6.3 Infrastructure and enabling systems
7.6.4 Methods, tools and techniques
7.6.5 Product acceptance <\/td>\n<\/tr>\n
29<\/td>\n7.6.6 Project organization
7.7 Project planning
7.7.1 General
7.7.2 Project initiation <\/td>\n<\/tr>\n
30<\/td>\n7.7.3 Project work plans <\/td>\n<\/tr>\n
31<\/td>\n7.8 Project assessment and control
7.8.1 General
7.8.2 Requirements management <\/td>\n<\/tr>\n
32<\/td>\n7.8.3 Scope change control
7.8.4 Schedule control
7.8.5 Budget control
7.8.6 Quality assurance
7.8.7 Subcontractor management
7.8.8 Project closeout <\/td>\n<\/tr>\n
33<\/td>\n7.9 Product delivery
7.10 Supporting processes
7.10.1 General
7.10.2 Project supervision and work environment
7.10.3 Decision management
7.10.4 Risk management <\/td>\n<\/tr>\n
34<\/td>\n7.10.5 Configuration management
7.10.6 Information management <\/td>\n<\/tr>\n
35<\/td>\n7.10.7 Quality assurance
7.10.8 Measurement
7.10.9 Reviews and audits
7.10.10 Verification and validation <\/td>\n<\/tr>\n
36<\/td>\n7.11 Additional plans
7.12 End matter <\/td>\n<\/tr>\n
37<\/td>\nBibliography <\/td>\n<\/tr>\n
38<\/td>\nIEEE notices and abstract <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ISO\/IEC\/IEEE International Standard – Systems and software engineering – Life cycle processes – Project management<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2019<\/td>\n42<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":398677,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-398675","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/398675","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/398677"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=398675"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=398675"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=398675"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}