{"id":425943,"date":"2024-10-20T06:59:28","date_gmt":"2024-10-20T06:59:28","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-86292019a12023\/"},"modified":"2024-10-26T13:12:15","modified_gmt":"2024-10-26T13:12:15","slug":"bs-86292019a12023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-86292019a12023\/","title":{"rendered":"BS 8629:2019+A1:2023"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
5<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 2 Normative references <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4 Need for an emergency evacuation alert system 4.1 Commentary 4.2 Recommendations 5 Consultation and definition of responsibilities 5.1 Commentary <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.2 Recommendations <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 6 Variations from the recommendations of this British Standard 6.1 Commentary 6.2 Recommendations 7 System components 7.1 Commentary <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 7.2 Recommendations <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 8 Monitoring, integrity and reliability of circuits external to the evacuation alert control and indicating equipment (EACIE) 8.1 Commentary 8.2 Recommendations <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 9 Evacuation alert zones 9.1 Commentary <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 9.2 Recommendations 10 Evacuation alert sounders and audibility 10.1 Commentary <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 10.2 Recommendations 11 Arrangements for disabled people 11.1 Commentary <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 11.2 Recommendations 12 Siting of evacuation alert devices 12.1 Commentary <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 12.2 Recommendations 13 Evacuation alert control and indicating equipment (EACIE) 13.1 Commentary <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 13.2 Recommendations <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Figure 1 \u2014 Suitable sign for EACIE cabinet <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Figure 2 \u2014 Appropriate configuration and appearance of controls and indicators <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 14 Networked systems 14.1 Commentary 14.2 Recommendations <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 15 Power supplies 15.1 Commentary <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 15.2 Recommendations for mains power supplies <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 15.3 Recommendations for evacuation alert system power supply units 15.4 Recommendations for standby supplies <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 16 Cables, wiring and other interconnections 16.1 Commentary <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 16.2 Recommendations <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 17 Radio-linked systems 17.1 Commentary 17.2 Recommendations <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 18 Electromagnetic compatibility 18.1 Commentary 18.2 Recommendations <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 19 Electrical safety 19.1 Commentary 19.2 Recommendations <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 20 Installation 20.1 Responsibility of the installer <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 20.2 Installation practices and workmanship <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 20.3 Inspection and testing of wiring <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 21 Commissioning and handover 21.1 Commissioning <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 21.2 Documentation <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 21.3 Certification <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 21.4 Acceptance <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 22 Maintenance 22.1 Inspection, testing and servicing <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 22.2 Non-routine attention <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 22.3 Modifications to the system <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 22.4 Inspection and test of the system following any fire <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 23 Premises management 23.1 Responsibilities <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 23.2 Log book <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | Annex A (informative)\u2002 Example wiring and equipment configuration Figure A.1 \u2014 Example wiring of an evacuation alert device circuit <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | Annex B (normative)\u2002 Method for calculating standby battery capacity for evacuation alert systems <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | Annex C (informative)\u2002 Model format for system log book <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | Annex D (informative)\u2002 Model certificates Figure D.1 \u2014 Model design certificate <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | Figure D.2 \u2014 Model installation certificate <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | Figure D.3 \u2014 gives a model commissioning certificate. <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | Figure D.4 \u2014 Model acceptance certificate <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | Figure D.5 \u2014 Model inspection, testing and servicing certificate <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | Figure D.6 \u2014 Model modification certificate <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Design, installation, commissioning and maintenance of evacuation alert systems for use by fire and rescue services in buildings containing flats . Code of practice<\/b><\/p>\n |