{"id":426749,"date":"2024-10-20T07:03:32","date_gmt":"2024-10-20T07:03:32","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/assce-gsp-337-2023\/"},"modified":"2024-10-26T13:20:58","modified_gmt":"2024-10-26T13:20:58","slug":"assce-gsp-337-2023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asce\/assce-gsp-337-2023\/","title":{"rendered":"ASSCE GSP 337 2023"},"content":{"rendered":"

Prepared by the Embankments, Dams, and Slopes Technical Committee of the Technical Coordination Council of the Geo-Institute of ASCE<\/p>\n

Highway 1 Rat Creek Embankment Failure: 2021 Reconnaissance and Analysis, <\/em>GSP 337,<\/em> provides an overview of the embankment failure in Big Sur, California, and details the investigation performed by the team mobilized by the Embankments, Dams, and Slopes Technical Committee. It further expands on the team\u2019s subsequent radiocarbon dating, data analysis, and recommendations for reducing future failures.<\/p>\n

Topics include<\/p>\n